Large Span Prefabricated Steel Frame Buildings Steel Space Frame Structures

Brand Name:Ruly Steel
Certification:SGS, ,ISO, BV
Model Number:Ruly0283
Minimum Order Quantity:500 Square Meter
Delivery Time:30 Days
Payment Terms:L/C, T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Qingdao Shandong China
Address: Tieshan Industrial zone, Huangdao District, Qingdao City.
Supplier`s last login times: within 40 hours
Product Details Company Profile
Product Details

Large Span Prefabricated Steel Frame Buildings Steel Space Frame Structures


Project description:

The building is used for storage of goods.
For multi - edge, multi - span steel frame structure building.
The total construction area is about 36,000 square meters.
Adopt light high strength steel beam-column connection main steel frame structure, save space, save cost and weight.
Rock wool sandwich board is used to do roof and wall insulation board.

Commercial large space large span prefabricated steel frame building.
We are a professional steel frame structure logistics and construction engineering company.
We provide you with one-stop service from design, BIM process, drawing details, steel structure fabrication, shipping and installation.



Specification of steel structure:

Item nameSpecificationMaterial ParameterTechnical Treatment
ColumnH shape,Box,steel pipe,Hot rolled sheetQ235B,Q355BPaint or Hot dip galvanized
BeamH shape,steel Truss,Hot rolled sheetQ235B,Q355BPaint or Hot dip galvanized
BracingSteel rod,Steel pipe,Angle steelQ235B,Q355B
PurlingC or Z shape, purling Thickness:1.8mm~3.0mmQ235B,Q355BHot dip galvanized
Wall and roof panelRock woolSteel T=0.426~0.8mm,insulation T=50~150mmAlu-zinc 150g, Fluorocarbon paint
DoorSliding or rolling doorSteel or Aluminum sheet,T=1.0~1.5mmPaint or Hot dip galvanized
Windowalloy-Glass,Aluminium alloy-shutterT=1.0~2.0mmAlloy
Lighting panelFRP, T=1.5mm or T=1.8mmCoefficient of thermal expansion:2.2x10-5/cm/cm/℃Light transmittance 85%
VentilatorTurbine ventilator, and electric typeSteel,stainless steel,PCPaint or Hot dip galvanized,304
GutterGalvanized or stainless steel plateT=2.0mmHot dip galvanized,304
DownpipePVC pipe,Color steel pipe T=0.5mmΦ110,160,200Paint
BoltOrdinary, high strength10.9S,4.8sHot dip galvanized
Anchor boltSteel rod M24,M27 M30Q235B

Designing:

Annual maintenance method of steel structure plant:

1. After the installation of our steel structure workshop, the owner is not allowed to privately change its structure, remove the bolts and other parts of _, or increase or reduce the partition wall. If any parts need to be changed, the owner can consult with the manufacturer and decide whether the change can be made.The steel structure should be maintained with paint after about 3 years of use, so as to give the building with beauty and safety.


2. Steel structure workshop should be cleaned and maintained regularly. Under normal circumstances, inspection and maintenance should be carried out once a year.When cleaning the outer wall of the steel structure workshop, we should pay attention not to mess. We should not use the steel wire ball, brush and other abrasive cleaning products. When using clean water, we should wash from top to bottom.Steel structure plant branches, leaves and other similar objects should be cleaned up in time, so as not to backlog caused unnecessary trouble.If there is any damage to the surface of the metal plate in the steel structure workshop, it should be repaired in time to avoid the corrosion of the metal plate by sun and rain.If necessary, all the high elastic nano materials are applied to protect the metal roofing panels, and play an effective role in heat insulation and waterproof, saving indoor air conditioning energy.


China Large Span Prefabricated Steel Frame Buildings Steel Space Frame Structures supplier

Large Span Prefabricated Steel Frame Buildings Steel Space Frame Structures

Inquiry Cart 0