Pre Engineered Prefabricated Steel Structure House Building

Brand Name:Ruly Steel
Certification:SGS, BV, ISO
Model Number:Ruly0352
Minimum Order Quantity:500 Square Meter
Delivery Time:30 Days
Payment Terms:L/C, T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Qingdao Shandong China
Address: Tieshan Industrial zone, Huangdao District, Qingdao City.
Supplier`s last login times: within 40 hours
Product Details Company Profile
Product Details

Prefabricated Steel Structure Building/Prefabricated Steel Structure House


General information:

Prefab steel houses are easy to build, saving time and effort
They are fireproof and provide thermal and cold protection
The building materials used are environmentally friendly and energy efficient
The service life of the steel structure house is more than 25 years
Environmentally friendly, no waste
Flexibility for fixing doors, windows and interior partitions
The exterior is beautiful, with different colors for the walls and roof.
Cost saving and convenient transportation


product details:

Characteristics and Advantages:

1. Saving construction time 50%- carry out apanaked decorate within 15 days
2. Safety performance improvement 100%- Anti-seismic, Wind resistant and durable
3. Energy saving 60% -New type materials are adopted for heat insulation and ventilation.
4. Reuse 90%- 90% material can be reuse
5. Eco-friendly 100%-No waste and pollution during construction

Our steel structure production factory:

The floor space of our steel structre fabrication factory is 35,000㎡, and the workshop area is 20000㎡. We own three light/heavy H steel production lines, BOX production lines, C/Z purlin production lines and various types of profiling steel sheet machines with advanced equipment such as plasma cutting machine.



How to install:


Packing and transport:

All the structure components, panels,bolts and sort of accessories will bewell packed with standard package suitable ocean transportation and loaded into 40’HQ.

All the products are loaded at the loading site of our factory using crane and forklift by our skilled workers,who will prevent the goods to be damaged.


How to quote:

The following question we need to know before making the price. Just feel free to fill what you know.

1Location (where will be built?)_____country, area
2Size: length*width*height_____mm*_____mm*_____mm
3wind load (max. wind speed)_____kn/m2, _____km/h, _____m/s
4snow load (max. snow height)_____kn/m2, _____mm
5anti-earthquake_____level
6brickwall needed or notIf yes, 1.2m high or 1.5m high
7thermal insulationIf yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; . if not, the metal steel sheets will be ok. The cost of the latter will be much
lower than that of the former
8door quantity & size_____units, _____(width)mm*_____(height)mm
9window quanity & size_____units, _____(width)mm*_____(height)mm
10crane needed or notIf yes, _____units, max. lifting weight____tons; max. lifting height _____m

China Pre Engineered Prefabricated Steel Structure House Building supplier

Pre Engineered Prefabricated Steel Structure House Building

Inquiry Cart 0