Add to Cart
Prefabricated Steel Structure Building/Steel Structure Multi-Storey Office Building
Prefabricated Steel Structure Building/Steel Structure Multi-Storey Office Building is more environmentally friendly than ordinary office buildings, and have better energy saving and consumption reduction. Since the processing and prefabrication of the main components of the steel structure office building are all carried out in the factory, and then transported to the construction site for assembly, such dry construction not only saves water and electricity, reduces energy consumption, but also reduces the impact of construction on the environment. After the completion of the steel structure office building, because the wall materials can be more selective today, if the wall material with thermal insulation is selected, the use of the office building will have better energy saving, which can reduce the use of air conditioners. reduce carbon emissions
Name | Prefabricated Steel Structure Building/Steel Structure Multi-Storey Office Building |
Structure Type | frame structure, flat roof |
Length | 80m |
Width | 60m |
Eave Height | 25m |
Roof Slope | 10% |
Steel Quantity | 3500 Tons |
Roof | 75 mm thick Rock wool sandwich panel |
Wall | 75 mm thick Rock wool sandwich panel |
Door | Sliding door |
Window | glass window |
Height difference between indoor and outdoor | 300mm |
Main Steel Frame System | |
Main structure | H section steel Q355, alkyd painting, two primary painting, two finish painting. |
Roof purlin | XZ160*60*20*2.5, galvanized |
Wall purlin | XZ160*60*20*2.5, galvanized |
Intensive bolt | Grade 10.9 |
Turn buckle bolt | M20+2, steel Q235, processing |
Anchor bolt | M24, steel Q235, processing |
Ordinary bolt | Galvanized bolt M20 |
Ordinary bolt | Galvanized bolt M12 |
Brace nut | Galvanized bolt M12 |
Bracing System | |
Cross brace | Φ20 round steel bar Q235, process and painted (alkyd painting) |
Angle brace | L50*5 angle steel Q235, process and painted (alkyd painting) |
Column bracing | Φ25 round steel bar Q235, process and painted (alkyd painting) |
Tie bar | Φ127*3 steel pipe Q235, process and painted (alkyd painting) |
Batter brace | Φ32*2.5, Φ12 round steel bar Q235, process and painted (alkyd painting) |
Wall & Roof System | |
Roof panel | Corrugated steel plate or sandwich panel (EPS/fiber glass/rock wool/PU) |
Wall panel | Corrugated steel plate or sandwich panel (EPS/fiber glass/rock wool/PU) |
Edge cover | 0.5mm color plate, angle Alu. |
Fittings & accessories | Nails, glue etc. |
Unpowered ventilator | Diameter Φ600, stainless steel |
Sky lighting band | 1.2mm FRP, double layer |
Sliding door | sandwich panel door |
Roof drainage system | |
Gutter | 0.5mm color steel plate |
Rainspout pipes | Φ110 PVC pipe |
Many customers have visited our factory for the long term cooperation."Quality firstly,Customer firstly" is our company principle.We obtain sound reputation because of our good quality and service. Meanwhile,We pay attention to the team work and value win-win cooperation, which would guide us much further.
We can produce light and heavy steel structure buildings, such as warehouse, workshop, storage, construction materials, high rise steel office buiding, factory , plant, exhibition hall, steel tile.
The following question we need to know before making the price. Just feel free to fill what you know.
1 | Location (where will be built?) | _____country, area |
2 | Size: length*width*height | _____mm*_____mm*_____mm |
3 | wind load (max. wind speed) | _____kn/m2, _____km/h, _____m/s |
4 | snow load (max. snow height) | _____kn/m2, _____mm |
5 | anti-earthquake | _____level |
6 | brickwall needed or not | If yes, 1.2m high or 1.5m high |
7 | thermal insulation | If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be
suggested; . if not, the metal steel sheets will be ok. The cost of
the latter will be much lower than that of the former |
8 | door quantity & size | _____units, _____(width)mm*_____(height)mm |
9 | window quanity & size | _____units, _____(width)mm*_____(height)mm |
10 | crane needed or not | If yes, _____units, max. lifting weight____tons; max. lifting height _____m |