Low Heat Loss Gas Oil Steam Boiler Equipment For Auxiliary Packaging

Brand Name:WILFORD
Certification:CE
Model Number:LSS
Minimum Order Quantity:1stand
Delivery Time:15-20 working days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Active Member
Address: No5, Nanyuan Road Economic Development Zone, Zhangjiagang
Supplier`s last login times: within 17 hours
Product Details Company Profile
Product Details

Low Heat Loss Gas Fired Steam Boiler Equipment LSS Series For Auxiliary Packaging


Product introduction


  • LSS series products --water tube structure, vertical three return and burner on top design.

  • The boiler has controller protection and automatic recovery of the contactor to prevent electric shock function.

  • It also has dual anti reflux and exhaust heat protection devices, which, strengthen the safety function.

  • Each part of the flue gas is heat-transferred through three return strokes, which reduces the temperature of the flue gas and reduces the heat loss during boiler warm-up and shutdown.


Parameter


TypeLSS0.5LSS1LSS1.5LSS2
ProjectUnit
Rated evaporationt/h0.511.52
Rated working pressureMPa0.7/1.01.0/1.251.0/1.251.0/1.25
Staturated steam temperature170/193184/193184/193184/193
Fuel consumptionLight diesel oilkg/h3570105140
Natural gasNm³/h4080120160
LPGNm³/h15304560
City gasNm³/h85170265340
a Main steam valve diameterDN40506580
b Safety valve diameterDN40505040×2
c Inlet diamaterDN25253240
d Blowoff Valve diameterDN25404040
e Chimney diameterDN250350400500
Overall sizeLmm1830198020452550
Wmm1780198022202780
Hmm2650308033803620
H1mm2100230026502880
φDiametermm1180138016801980
WeightT1.8/2.22.3/2.83.3/44.3/5.2

Feature


1 . Pipe flow type, vertical three return


2 . The furnace starts fast


3 . Low exhaust gas temperature and low heat loss


4 . High thermal efficiency


5 . Various protection devices are complete



Product picture



Project case diagram



FAQ

Q : Are you a factory or a trading company?
A : We are a 20 years old industrial boiler factory, specializing in gas oil diesel electric fired boilers.

Q : What is the Warranty for the boilers?

A : Our steam boiler warranty is one year, During the warranty period, any parts damaged, you can get a new parts for free.

Q : How long should we wait for delivery?

A : Usually it will take about 35-45 days for pressured boilers, If you need to change the voltage or pressure, it need more time.
Q : What about your payment term?
A : Usually it would be 30% deposit payment, 70% balance before delivery. We accept T/T, L/C and other payment way.

China Low Heat Loss Gas Oil  Steam Boiler Equipment For Auxiliary Packaging supplier

Low Heat Loss Gas Oil Steam Boiler Equipment For Auxiliary Packaging

Inquiry Cart 0