Large Steel Structure High Rise Building , Strong Steel Structure Industrial Building

Brand Name:POWERUP
Certification:ISO9001, ISO14001, ISO18001
Model Number:POWERUP-010
Minimum Order Quantity:10 MT
Delivery Time:26 working days after prepayment
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Active Member
Location: Qingdao Shandong China
Address: Room 12-22, Chuangke Square, No. 88, Fuzhou South Road, Fu'an Street, Jiaozhou, Qingdao, China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

Design and manufacture Q235B, Q345B Hot-dip Galvanized or Painted Building Steel Structure with EN1090 Certification.


Steel structure buildings is a new type of buildings which is widely used as workshop, warehouse, office building, school buildings, hangar, car parking, stadium, etc. It is easy assembly, quick installation, long life, recycle using factors, the steel structure buildings can replace the traditional concrete buildings or brick buildings.


Characteristics of steel structure building:

1. Enviromental friendly

2. Lower cost and maintenance

3. Long using time up to 50 years

4. Stable and earthquake resistance up to 9 grade

5. Fast construction, time saving and labor saving

6. Good appearance


Below materials are general used in steel buildings , each type will be customized depend on clients requirements


Item NameMaterials CharacteristicsMaterial GradeSurface Treatment
Steel ColumnH shape,Box,Steel Pipe,Hot tolled sheetQ235B,Q345BPaint or Hot dip Galvanized
Steel beamH shape,Box,Steel Pipe,Hot tolled sheetQ235B,Q345BPaint or Hot dip Galvanized
Steel BracingSteel Rod,Steel Pipe,Angle SteelQ235B,Q345BPaint or Hot dip Galvanize

ServiceDesign, Fabrication and Installation
We can make quotation according to customer's drawing or requirement; (size by length/width/height and wind speed), offering a free design drawing and all detailed drawings for installation.
Design software: Auto CAD,PKPM,MTS,3D3S, Tarch, Tekla Structures(Xsteel)V12.0.etc
PackingAccording to customer's requirement
Load into 40/20GP,40HQ or 40OT

The following are some of our photos for you to check:


1. Our workshop:

2. Steel structure under fabrication:

3. Our inspector is doing UT test:

4. Our steel structure products under construction:

5. Our Loading:


Steel Structure fixed packing, loading, transportation, unloading the matters needing attention:
(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.
(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile up securely, and to increase the necessary binding component loosening, prevent the loss.
(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.
(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.
(5) The member to the construction site, timely organization of unloading, stacking area.
(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.


If you are interested in our steel structure products, please don't hesitate to contact us. We are sure to give you a competitive price and a perfect quality. And welcome to visit our factory!

China Large Steel Structure High Rise Building , Strong Steel Structure Industrial Building supplier

Large Steel Structure High Rise Building , Strong Steel Structure Industrial Building

Inquiry Cart 0