PP Materials Formwork Building Hardware Making Machine Plastic Construction

Brand Name:Acemien
Certification:CE
Model Number:SJZ120
Minimum Order Quantity:1SET
Delivery Time:45 Working days
Payment Terms:L/C, T/T, Western Union
Contact Now

Add to Cart

Active Member
Address: No.2,Changhong Road, Modern Agriculture Demonstration Park, Zhangjiagang City, China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

PP materials plastic construction formwork building hardware making machinery


1. The best toughness
Can be used to make other different shapes and size formworks.Bending strength:Lateral pressure 14Mpa , Vertical pressure 21Mpa .Bending modulus:Lateral pressure 782Mpa ,Vertical pressure 970Mpa.

2. Waterproof-hollow design
Hollow design make the formwork structural stability .Dimensional shrinkage under heat:lateral 0.15% Vertical 0.13% .Diffcult deformation, no mildew; Long-term immersion stratification in the water, no bubbles, sheet size stability, especially suitable for underground and damp environment.

3. Acid and alkali resistance, corrosion resistance
Very suitable for the engineering application in coastal areas, mine, as well as seawall. It is need not do any preservative treatment both in using and storing the formworks, which do not pollute the concrete surface.


Installation instructions:


• 1, Use the hollow building formwork intersecting surface laid with 15 mm thick.

  

• 2, Wood square of the distance :

  

• 1, On the surface of the intersection (spacing: wood square distance according to the thickness of the slab concrete, in general, the thickness of less than 0.15 m floor (spacing is 200 ~ 250 mm.

  

• 2, The shear wall (spacing: (spacing according to adjust the spacing, height and thickness of the wall to wall height of 2800 mm, 300 mm thick wall, for example, using the formwork (15 mm thickness spacing is 100 ~ 150 mm, if the shear wall, pillar width more than 1 meter, must add the fixed frame.


  

• 3, When the nail to the formwork from the formwork edge distance 15 ~ 30 mm, strength wants moderate, nail nails is 40 ~ 50 mm in length, shoulds not be too long or too short.

  

• 4, Beam bottom of a piece of wood square must set aside 15 mm seam allowance, wallboard made on wood square seam allowance, it does not leak slurry and wallboard material saving.





Features of plastic construction formwork:


Hollow Plastic Formwork Dimensions

Width x Length(mm)

Thickness

Weight(kg)
915mmx1830mm
14mm

10kg

915mmx1830mm

15mm

12kg

915mmx1830mm

18mm

13kg

1220mmx2440mm

14mm

18kg

1220mmx2440mm

15mm

20kg

1220mmx2440mm

18mm

25kg


Advantage:

Comparision of hollow plastic formwork and other formworks
PerformaceHollow plastic formworkModular plastic formworkPVC plastic formworkPlywoodBamboo ploywoodMetal formwork
Wear ResistanceGoodGoodNONONONO
Corrosion ResistanceGoodGoodNONONONO
TenacityGoodBadBadBadBadBad
Impact StrengthHighEasily brokenNormalPoorPoorPoor
Absorbing waterNo defomingNo deformingDeformingDeformingDeformingDeforming
Mold ReleaseDonot needDonot needNeedNeedNeedDonot need
Warp After usingNoNoYesYesYesYes
Weight(kg/m2)610158812
RecyclabilityYesYesYesYesYesYes
Bearing capacityHighEasily brokenNormalNormalNormalNormal
ECO-FriendlyYesYesYesNONONO
Cost of usageCheapExpensiveExpensiveExpensiveExpensiveVery expensive
Reusable TimeOver 60 timesOver 60 times20-30 times4-6 times7-9 times90 times




FAQ
1.Q: Are you manufacture factory or a trader?

A: We are an industrial manufacture factory of plastic extrusion machinery for years, which locates in Zhangjiagang city, China.



2.Q: What's your payment term:


A: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/C 100%, or negotiate according to the order status.


3.Q: Can we visit your factory ?


A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case



4. Q: How do you make the quotation for clients?


A: The price depends on quality and performance but the clients should be satisfied first.



5. Q: Do you have any after-sale service ?

A:Yes,we have professional after-sale teamwork . any technical question could be solved in 24 hours by our after-sale teamwork.



6. Q: How do you install your equipment in our factory ?

A: We have professional after-sale &installation teamwork, we will arrange our engineer fly to ur factory install and teach ur labor .

Our Packing and Shipping



Our exhibition



China PP Materials Formwork Building Hardware Making Machine Plastic Construction supplier

PP Materials Formwork Building Hardware Making Machine Plastic Construction

Inquiry Cart 0