100 Ton Bridge Beam Segmental Lifter Girder Steel Launching Crane
Product Description
100 Ton Bridge Beam Segmental Lifter Girder Steel Launching Crane
is used for erecting concrete box girders for high speed (250km,
350km) passenger railway lines. This machine is suitable for equal
span girders or different span girders which can be 20m, 24m and
32m, 50m. The rear part has two supports. One of the supports is
"C" shape column with rotary and foldable technology. The "C" shape
column technology saved the traverse space during traveling and
which enables to travel through tunnels with the girder transfer
vehicle.
Method for maintaining parts of Girder Steel Launching Crane
Comparing the Girder Steel Launching Crane with the ordinary bridge
crane, it is found that there are obvious differences, that is,
when the electric hoist is working, the sparks that are not
generated or generated are not enough to affect the surrounding
environment, so some can be used. Inflammable, explosive, dust and
other places.
Even so, when using a Girder Steel Launching Crane, we need to pay
attention to its maintenance, especially the motor. For example,
for parts removed from a Girder Steel Launching Crane, avoid
contamination or wrapping with clean cloth, avoid contamination or
wrapping with clean cloth, or place parts in designated containers
to prevent loss during operation. .
In addition, the disassembly and assembly of the double girder
bridge machine must have the opposite operation process. During the
operation, the parts that should be paid attention to should avoid
collision or impact, and should not be used as tools or fulcrum.
How to operate the dismantling and maintenance of Girder Steel
Launching Crane
When removing the truss beam, it should be made of sleeper rafts.
Shackle raft towers should be constructed securely and reliably.
High-strength bolts dismantled after flame heating must be
discarded and not inherited or used.
2. Staff entering the demolition site must wear safety caps and
protective shoes. Staff working on truss beams must wear security
belts. This is also the security protection for the operation of
bridge installation equipment.
3. Before dismantling, the electrician shall mark each cable and
wire, and shall dismantle the dismantling site. Strictly prohibit
the entry of unrelated employees;
4. When there is a bolt that is temporarily dismantled, it should
be dismantled after it has penetrated into the diesel. Forced
disassembly is not allowed after strong impact or heating with
flame;
5. After the highway bridge frame beam is completed, the track
should be laid, and the road bridge machine should be dismantled at
the bridge head. Workers should identify hydraulic fittings,
cylinders and other parts that need to be marked for easy
disassembly and assembly;
6. Dismantling work is organized and guided by the bridge person in
charge and technicians in the reverse order of assembly.
7. The removed parts should be handled and stored separately, and
the joints of hydraulic pipe joints should be sealed.
Product Parameters
Max Span | 50m | 40m | 35m | 30m |
Hoist Capacity | 160t | 100t | 80t | 60t |
Lifting Speed of Trolley | 0.8m/min | 0.8m/min | 0.8m/min | 0.8m/min |
Moving Sspeed of Trolley | 4.5m/min | 4.5m/min | 4.5m/min | 4.5m/min |
Moving Speed of Crane | 2.7m/min | 2.7m/min | 2.7m/min | 2.7m/min |
Loading Capacity | 80t×2 | 50t×2 | 40t×2 | 30t×2 |
The Speed of Heavy Load | 4-8m/min | 4-8m/min | 4-8m/min | 4-8m/min |
The Speed of Empty Load | 18m/min | 18m/min | 18m/min | 18m/min |
Max Angle of Inclined Bridge | 45° | 45° | 45° | 45° |
Parts Of Crane