Overhead Workstation Bridge Crane Cabin Double Girder With Trolley 50 Ton

Brand Name:Dowellcrane
Certification:ISO CE BV CCC GOST SGS
Model Number:QD Double Girder Overhead Crane
Minimum Order Quantity:1 Set
Delivery Time:25days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Active Member
Location: Xinxiang Henan China
Address: Economic Development Area, XinXiang city, Henan province, China.
Supplier`s last login times: within 31 hours
Product Details Company Profile
Product Details

Steel Plant 50 Ton Cabin Double Girder Overhead Bridge Crane With Trolley


Product Description


Steel Plant 50 Ton Cabin Double Girder Overhead Bridge Crane With Trolley mainly consists of bridge, trolley travelling mechanism, trolley and electrical appliances, and is divided into 2 working grades of A5 and A6 according to the use frequency. Steel Plant 50 Ton Cabin Double Girder Overhead Bridge Crane With Trolley, the hook bridge crane can be used to lift loads from 5 tons to 350 tons, which is widely used in warehouse, factories and other working sites. Steel Plant 50 Ton Cabin Double Girder Overhead Bridge Crane With Trolley is widely used to upload and move of normal weight in the fixed crossing space and also can work with various special-purpose hoist in special operations.



Product Advantages


Cranes are divided into many kinds, including gantry crane, single beam crane, double beam crane, bridge crane and so on.Gantry crane and bridge crane to develop a comparison; Comparatively speaking, in the load-bearing beam form, hoisting tons, application of span, improve the ratio of height to width and other major parameters of all kinds of specifications are the same, the price of the bridge crane is much more cost-effective than the portal crane. The low cost of the project and the additional versatility will not be reduced, which is a very good choice for these newly developed smes.

In addition, the overall operation of the bridge crane is all carried out on the cable bridge rail, its work in the scope of the general production of a relative standard in the factory building in the air area, the foundation will not be damaged by the road machinery and equipment, and can be flexible use of the cable bridge directly under the indoor space for lifting raw materials. Working up both high efficiency and save indoor space, for small-scale taxpayers of the company plant, this is not a double choice?
To discuss about the motion form of bridge crane. It has three movement forms, respectively is: lorries motor drives down the production workshop tracks do vertical movement, the hoisting equipment around improve organization with car electric drive sideways movement up and down) on the bearing beam, improve the lifting hook hanging around doing vertical movement. It is not difficult to see that the movement form of bridge crane has a strong random strain, which can meet the requirements of different lifting work.
For the small scale of the company's plant, not only want to reduce the cost cost, but also want to improve efficiency, expand the annual output value, bridge crane can be said to shake the customer's requirements, therefore, a large number of company plants choose to use the bridge crane in the assembly shop or factory.


Parts Of Crane


China Overhead Workstation Bridge Crane Cabin Double Girder With Trolley 50 Ton supplier

Overhead Workstation Bridge Crane Cabin Double Girder With Trolley 50 Ton

Inquiry Cart 0