

Add to Cart
Hot Sale Oat Bar Forming Machine/Oatmeal Chocolate Production Line can produce oat meal chocolate with various shapes and sizes.
It is fully cutomatic machine, which uses the method of forming + freezing to blending oat meal and chocolate. After mixing the raw material, the procedures of forming, demolding and freezing are all performed automatically, and only needs one worker to mix and feed the material, which could reduce labour source. The whole machine has high efficiency and covers small area. One worker can operate this machine.
Moulds and hopper are made of food-grade materials with elaborate design;
Safe and healthy. Accurate Positioning; 100% high yield; without waste.
Easy operation, high efficiency, stable performance.
At the same time, the machine can be realized any shape's forming.
Technical Parameters
Mold Quantity | 90pcs forming moulds + 1 pressing mould + 1 de-moulding mould |
Capacity | 10-12 trays per minute |
Power | 380V 20kw |
Weight | 1500kg |
Dimension | 6500 x 1500 x 2700mm |
Equipment Involved | Forming Machine x 1 set Freezing Tunnel x 1 set Molds x 1 set (90pcs forming moulds, 1 pressing mould and 1 de-moulding mould) Demoulding Device x 1 set Mould Conveyor x 1 set Cooling System x 1 set |
Commissioning & After-sales Service:
1. We make accurate factory layout design according to customer’s
factory size; if the customer needed, we could make workshop design
with electricity power, water supply, gas power, material storage,
final storages, worker’s restroom, etc.
2. After delivering machines to client’s factory, we start to apply
for the Visa to client’s country immediately; normally the vessel
needs 20-60 days to the required port, so we have enough time to
get the Visa. While the machines arrives your factory, our
engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and
adjust the processing line to realize normal production at shortest
time.
4. Our engineers have responsibility to train and teach the workers
how to operate, clean, maintain and repair all the machines, until
the workers could well operate the processing line.
5. It normally costs 10 days for the commissioning service, and we
supply 1 year guarantee from the date of completion of
commissioning service.
6. The engineer’s round-trip flight tickets, accommodation and
daily salary USD 100 are on client’s account.
Model | Power | Capacity | Weight | Dimension |
SYA-560 | 20kW | 10000 pieces/h | 3T | 5500*1400*2800mm |
Shipping
Our Certificate
Our Customer
Machine video:
>
Any interest, please be free to contact us!