

Add to Cart
50w Solar Powered Lights Flux 6750lm, Color Temp 4000K, IP67
Feature
Parameters
Item | TL-3503 | TL-3503 | TL-3503 | TL-3503 | |
Light Style | Split | Split | Split | Split | |
POWER | 40W | 45W | 50W | 55W | |
LED | Flux | 5400~6600 lm | 6075~7425 lm | 6750~8250 lm | 7425~9075 lm |
Color Temp | 4000~6000K | 4000~6000K | 4000~6000K | 4000~6000K | |
Brand | CREE | CREE | CREE | CREE | |
Max Power | 40W | 45W | 50W | 55W | |
Life | 50000hrs | 50000hrs | 50000hrs | 50000hrs | |
Solar Panels | Largest Wattage | 120W monocrystalline silicon | 135W monocrystalline silicon | 150W monocrystalline silicon | 165W monocrystalline silicon |
Life | 25years | 25years | 25years | 25years | |
Battery | Type | Lithium iron phosphate battery 1100WH | Lithium iron phosphate battery 1240WH | Lithium iron phosphate battery 1380WH | Lithium iron phosphate battery 1510WH |
Life | 5-8years | 5-8years | 5-8years | 5-8years | |
Control | Type | ChanPower MPPT / PWM | ChanPower MPPT / PWM | ChanPower MPPT / PWM | ChanPower MPPT / PWM |
Charge / time | valid for 6 hours of sunshine | valid for 6 hours of sunshine | valid for 6 hours of sunshine | valid for 6 hours of sunshine | |
Discharge / time | Half Power48hrs,Full Power 24hrs | Half Power48hrs,Full Power 24hrs | Half Power48hrs,Full Power 24hrs | Half Power48hrs,Full Power 24hrs | |
Lighting Time | 12hrs every day 3-5 rainning days | 12hrs every day 3-5 rainning days | 12hrs every day 3-5 rainning days | 12hrs every day 3-5 rainning days | |
Normal Setting | 5 Time Save Setting,[eg. X% Power Light 1st 4 hours,X% Power Light 2nd 4 hours, X% Power Light 3rd 4 hoursr] | 5 Time Save Setting,[eg. X% Power Light 1st 4 hours,X% Power Light 2nd 4 hours, X% Power Light 3rd 4 hoursr] | 5 Time Save Setting,[eg. X% Power Light 1st 4 hours,X% Power Light 2nd 4 hours, X% Power Light 3rd 4 hoursr] | 5 Time Save Setting,[eg. X% Power Light 1st 4 hours,X% Power Light 2nd 4 hours, X% Power Light 3rd 4 hoursr] | |
Light Fixture | Materials | Aluminium | Aluminium | Aluminium | Aluminium |
Style | Selectable | Selectable | Selectable | Selectable | |
Installation | Height and Distance | Height 5-7M / Distance10-20M | Height 5-7M / Distance10-20M | Height 5-7M / Distance10-20M | Height 5-7M / Distance10-20M |
Installation Hole | Diameter:40-75MM | Diameter:40-75MM | Diameter:40-75MM | Diameter:40-75MM | |
Pole | Type | Cone [Ø60mm/Ø140mm] | Cone [Ø60mm/Ø140mm] | Cone [Ø60mm/Ø140mm] | Cone [Ø60mm/Ø140mm] |
Material | Galvanized Sheet with Coating | Galvanized Sheet with Coating | Galvanized Sheet with Coating | Galvanized Sheet with Coating | |
Length | 5-7M | 5-7M | 5-7M | 5-7M | |
Thickness | 2.5MM | 2.5MM | 2.5MM | 2.5MM | |
Weight | 25-30kg | 25-30kg | 25-30kg | 25-30kg | |
Flange | 250*250mm | 250*250mm | 250*250mm | 250*250mm | |
Anchor Bolt | 2kg | 2kg | 2kg | 2kg |
FAQ
Q: Can I have a sample order for led light?
A: Yes, Chanpower welcome sample order to test and check quality. Split style solar street lights is suitable for project according to clients’ requirement, need more time for confirm.
Q: What about the delivery date?
A: Sample needs 3-5 days, mass production time needs 1-4 weeks for
order quantity more than one container.
Q: Do you have any MOQ limit for led light order?
A: for solar street light controller, 1pc for sample checking is
available
Q: How do you ship the goods and how long does it take to arrive?
A: Chanpower usually ship by DHL, UPS, FedEx or TNT. It usually
takes 3-5 days to arrive. By sea or by air optional.
Q: How to proceed an order for solar led street light?
A: Firstly,let us know your requirements or application.
Secondly,Chanpower quote according to your requirements or our
suggestions.
Thirdly,customer confirms the details and places deposit for formal
order.
Fourthly,Chanpower arrange the production.
Q: Can Chanpower use our my logo on the solar led light products?
A: Yes. Please inform us formally confirm the design before our
production.
Q: Do you offer guarantee for the products?
A: Yes, Chanpower offer 3 years warranty to our products.
Q:How to deal with the faulty?
A: Firstly, Please send us some pictures or videos of the faulty
item for our analyzation. Our products are produced in strict
quality control system and the defective rate will be less than
0.2%.
Secondly, during the guarantee period, Chanpower will send new
parts with new order for defective products and Chanpower will
assess if it’s necessary to return the faulty item, Chanpower can
discuss the solution including recall according to real situation.