HDPE Yogurt Bottle Hot Juice Filling Machine Press Cap Bottling
Equipment
Trait
1. Using the wind sent access and move wheel in the bottle directly
connected technology; canceled screw and conveyor chains, this
enable the change the bottle-shaped become easier.
2. Bottles transmission adopt clip bottleneck technology,
bottle-shaped transform not need to adjust the equipment level,
only change related the curved plate, wheel and nylon parts is
enough..
3. The specially designed stainless steel bottle washing machine
clip is solid and durable, no touch with the screw location of
bottle mouth to avoid secondary pollution.
4. High-speed large gravity flow valve filling valve, filling fast,
filling accurate and no liquid lose.
5. Spiraling decline when output bottle, transform bottle shape no
need to adjust the height of conveyor chains.
6. Host adopt advanced PLC automatic control technology, the key
electrical components from famous company such as Mitsubishi,
Schneider
Technical specification
Model | Washing heads | Filling heads | Capping heads | Capacity(bph)500ml | Motor power(KW) | Overall dimension(mm) |
18-18-6 | 18 | 18 | 6 | 8000 | 3.75 | 2800x1900x2650 |
24-24-8 | 24 | 24 | 8 | 10000 | 5.5 | 3000x2100x2650 |
32-32-10 | 32 | 32 | 10 | 15000 | 5.75 | 3500x2500x2650 |
40-40-10 | 40 | 40 | 10 | 20000 | 6.5 | 4000x1800x2650 |
FAQ
Q: What information we should supply for you if I wanna get an
appropriate quotation?
A: Pls inform us the filling capacity(how many bottles per hour),
bottle size you use (300ml-2000ml pet bottle), filling mineral
water or pure water? Need a full line or just filling machine?
Q: How many machines included in full line ?
A: The complete line includes: Water Treatment System- Automatci PET
Bottle blowing machine- Automatic 3 in 1 water filling machine -
Lamp inspection - bottle dryer - Automatic PVC shrink labeling
machine - Automatic ink jet printer - Automatic PE Film Shrink
wrapping Machine or Carton Packing Machine - Storage Room.
Q: If we juat wanna open a small scale for start, what capaity do
you recommend?
A: If you're new for this business, we suggest you choose
2000BPH/3000-4000BPH for start.
Q: What else information we should supply for you
A: Factory layout -- We should make machine layout as your factory
layout, how to put machine and save space. Whether need extra
buffer conveyor for line.
Bottle sample/caps -- After you placed an order,we will machine
machines as your bottle sample and caps.
Q: What's the manufacture time commonly ?
A: Commonly the full line manufacture time below 8000bph is 35-40
working days after receive bottle sample
If with blowing machine the manfacture time will be 45-50 working
days over 8000bph.
Detailed photo for ref