

Add to Cart
OVERHEAD INSULATED CABLE 15KV AAC/SC/XLPE 1X120MM2 EN50397
OVERHEAD INSULATED CABLE 15KV AAC/SC/XLPE 1X120MM2 EN50397 parameters
Nominal Conductor Area (mm2) | Typical Conductor Stranding | Nominal Conductor Diameter (mm) | Conductor Screen (mm) | XLPE Insulation (mm) | Approximate Overall Diameter (mm) | Approximate Cable Net Weight (kg/km) |
120 | 7/4.75 | 13.1 | 0.3 | 2.3 | 19.45 | 477 |
OVERHEAD INSULATED CABLE 15KV AAC/SC/XLPE 1X120MM2 EN50397 Images
About Zhenglan Cable Technology Co., Ltd
Zhenglan Cable Technology CO., Ltd.,formerly known as HENAN
Zhengzhou Cable Co., Ltd., is one of the large scale backbone
enterprises in China's wire and cable industry. The company's
registered capital is about 4 million 6 thousand yuan and its
headquarter is located in 49 floor of the South Tower of the
Greenland Center of Zhengzhou high railway station (Petronas Twin
Towers). The factory is located in the Zhengzhou cable science and
Technology Industrial Park of the Wuzhi industrial area. It is a
modern industrial park integrating advanced research and
development technology and production technology.
FAQ
Is your company a factory or a trade company?
Factory, more than 20 years in China
How long can I expect to get the sample?
After you pay the freight charge and send us confirmed files, the
samples will be ready for delivery in 3-7 days. The samples will be
sent to you via express and arrive in 3~7 days. You can use your
own express account or prepay us if you do not have an account.
What are your payment terms?
We normally accept T/T 30% deposit, 70% balance before delivery as
the main payment terms, and other payment can also be negotiated.
Trade assurance on is also available.
What’s the delivery time?
Sample order needs 3~5 days. Formal order depends on the quantity.
Usually it needs 7-30 days after get your payment.
What is your MOQ?
Generally it is 5000m.