Precast Concrete Pile Foundation Equipment ZYC280 7.7m/Min Piling Speed With Excellent Quality

Brand Name:T-works
Certification:CE,GOST
Model Number:ZYC280
Minimum Order Quantity:1 unit
Delivery Time:30-45 days after deposit received
Payment Terms:L/C, T/T, D/P, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Changsha Hunan China
Address: No,21,Yongyang Road, Liuyang Hi-tech Industrial Development Zone, Changsha, Hunan, China 410323
Supplier`s last login times: within 22 hours
Product Details Company Profile
Product Details

Precast Concrete Pile Foundation Equipment ZYC280 7.7m/Min Piling Speed With Excellent Quality


1. Description:

ZYC series hydraulic static pile driver is a new environmentally friendly pile foundation construction equipment with a number of national patents. It has the features of no pollution, no noise, no vibration, and fast pile driving, high quality pile. It is represent the future development tendency of pilling machinery.


2. Applications:

  • Clay, soft soil, sand layer, etc.
  • Noise regulated urban area.
  • Vibration regulated areas where traditional methods may threaten the stability of existing structures.

3. Specifications:

Parameter/ModelZYC280
Rate piling pressure(KN)2800
Piling speed(m/min)Fast7.7
Low1.8
Piling stroke(m)1.9
Pace(m)Longitudinal2.4
Horizontal0.6
Angle range(°)15
Rise stroke(m)1.0
Square pile(mm)Max500
Circle pile(mm)Max500
Side piling(mm)900
Corner piling space(mm)1800
Lifting weight(t)12
Pile hanging length(m)14
Power(KW)Piling60
Lifting30
Main dimension(m)Work length12
Work width6.1
Transpot height3.1
Total weight(t)280


5. After sale service and quality gurantee

1) To train operating,maintenance and construction people for our customers.

2) Always be ready to answer technical questions concerned from our customers.

3) Be responsible for the quality of our products and provide technical service of installing,making ajustment,testing and maintenance on the site in time.

4) To dispatch technicans to the worksite at short notice to solve problems or fix breakdowns.

5) Keep a record of our customers and be informed of the working performance of our products,feedback and suggestions of our customers so as to make a good cooperation with customers.
6) We guarantee to keep our Main Machine in good repair for 1 year after sale and 6 months for accessories. In the guarantee time, any quality problem caused by manufacturing after confirmation of us shall be repaired for free; Exceed the guarantee time, we can also supply repair services to our products charged for repair cost only.

China Precast Concrete Pile Foundation Equipment ZYC280 7.7m/Min Piling Speed With Excellent Quality supplier

Precast Concrete Pile Foundation Equipment ZYC280 7.7m/Min Piling Speed With Excellent Quality

Inquiry Cart 0