Pre-engineered Temporary Modular Bridge Lightweight Steel Overcrossing Project 200-type

Brand Name:FAMOUS
Certification:ISO9001
Model Number:FMS200
Minimum Order Quantity:1
Delivery Time:30 days
Payment Terms:L/C, T/T, D/A, D/P, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Hangzhou Zhejiang China
Address: 3/F Talent Building, Shiqiao Subdistrict, Xiacheng District, Hangzhou China
Supplier`s last login times: within 30 hours
Product Details Company Profile
Product Details

Lightweight 200-type Pre-engineered Modular Steel Bailey Overcrossing Project

Description

Most Bailey bridges are assembled and installed in a matter of days by a small crew. Common hand tools are utilized. All connections are pinned, bolted or clamped. No welding is necessary. Dis-assembly is similarly easy, and components can be stored in minimal space until reused. Bailey bridges are often installed by the cantilever launching method, in which the assembled bridge together with a “launching nose” is rolled out across the gap, without false-work or heavy equipment. The cantilever method allows bridges to be quickly erected over rivers or deep gorges. Additionally, some Bailey bridges may be hoisted into place by crane.


Specification

Product NameModular steel bridge
Width7.6m
Maximum span64meter single span and 200meter multi span
Bridge deckSteel composit panel
Steel gradeQ345B (equivalent to ASTM A572)
Loading capacity20ton, 40ton truck etc, or HS20-44, HS25-44/Truck 20
CorrosionOriginal painted or Hot dip galvanized
AdvantagesPrice effective and technical full analysis and supports

Three normal width bridges are as following:

3.15m width (model CB100/321): light weight and load, mostly used over middle or small span rivers.

4.2m (model HD200) width: marked both in metric and inch dimension, mostly used in International market over middle and large span rivers.

7.35m width (model HD200): two-lane bridge, widely used over various rivers.


Application

Three normal width bridges are as following:
3.15m width (model CB100/321): light weight and load, mostly used over middle or small span rivers.
4.2m (model HD200) width: marked both in metric and inch dimension, mostly used in International market over middle and large span rivers.
7.35m width (model HD200): two-lane bridge, widely used over various rivers.


Type
Beam Bridge
Boardwalk
Clapper bridge
Duckboards, Timber track way, Plank road, and Corduroy road
Moon bridge
Simple suspension bridge
Simple truss
Stepping stones
Zigzag bridge


Features and Benefits

1.Environmental protection

2.Higher reliability of steel work

3.Strong quake proof

4.Higher degree of industrialization

5.Quick to be assembled accurately

6.Larger interior space


Advantage

1.High strength and big stiffness, relative to the concrete bridge can be reduced trabecular high and self-respect
2. Due to the steel isotropic, quality of a material is uniform and modulus of elasticity, that make steel bridge in the working condition and calculation compared with the assumption
3. Steel bridge generally USES factory, site splicing, the construction period is short, processing convenient and not affected by seasonal effect.
4. Steel bridge is suitable for industrialized manufacture and very convenient to transport.
5. Steel bridge is easy to repair and replace,which has long lifetime. Material can be recycled components, with light weight and low cost.


Installation

Most Bailey bridges are assembled and installed in a matter of days by a small crew. Common hand tools are utilized. All connections are pinned, bolted or clamped. No welding is necessary. Dis-assembly is similarly easy, and components can be stored in minimal space until reused. Bailey bridges are often installed by the cantilever launching method, in which the assembled bridge together with a “launching nose” is rolled out across the gap, without false-work or heavy equipment. The cantilever method allows bridges to be quickly erected over rivers or deep gorges. Additionally, some Bailey bridges may be hoisted into place by crane.



Our company

Our experienced team is focused on your steel bridge project's success, from start to finish. Our proven ability to identify and overcome design inconsistencies, potential problems with erection, and shipping obstacles results in the fabrication of structural steel that is right the first time, helping you avoid costly construction delays.


Proper project coordination and efficient delivery of the structural steel to your bridge project is a key factor in its ultimate success. This is what gives us the leading edge.


From material purchase and tracing, planning compilation, drawing detailing, production arrangement, quality inspection, to on-going painting, packing and delivering, we have separated department to strictly control process, quality and traceability, so that the perfect Bailey/Belay/Baley Bridge can be made.


Finally we would like to emphasize that not like other companies, nearly all machining parts and mechanical accessories are manufactured in our own shop as we have so many wonderful machines and workers inside. In this way, the quality, cost and delivery time can be ensured which eliminates other exterior factors’ influence.

Warmly welcome all friends and clients from International market to visit us!

China Pre-engineered Temporary Modular Bridge Lightweight Steel Overcrossing Project 200-type supplier

Pre-engineered Temporary Modular Bridge Lightweight Steel Overcrossing Project 200-type

Inquiry Cart 0