

Add to Cart
High Bearing Capacity Concrete Wall Panels Aluminum Formwork System With Best Price Peri Formwork
Product Description
Product Advantages:
1. Low average cost (can be reused for more than 300 times)
2. Safe (can load 60KN/m2)
3. Light weight (22-25kg/m2)
4. Good hardness
5. High efficiency on installing & dismantling
6. Environmental friendly
Aluminum Formwork | |
Material | 6061-T6 Aluminium alloy |
Main Components | Beam,Column,Wall,Prop,Others |
Safe Working Load | 60KN/m2 |
Size | Non-standard: custom-made as per buy’s requirements |
Capacity | 20000 sqm per month |
Applications | Exhibition setup |
Interior refurbishing | |
All the towers can be connected together for multi-purpose |
Prop Of Aluminum Formwork | |||||
Material | Q235 Q275 Q345 | ||||
Usage | To support aluminum formwork firmly and safely (Concrete Construction Works) | ||||
Type | Heavy / light duty | ||||
Surface Treatment | Painted varnish / pre-galvanized / Hot dip galvanized | ||||
Fixed Pin | Straight or Hook | ||||
Common Height(m) | 1.6 - 2.9 | 1.7 - 3.0 | 1.8 - 3.2 | 2.0 - 3.6 | 2.2 - 4.0 |
2.4 - 3.9 | 2.5 - 4.5 | 2.6 - 5.0 | 3.0 - 5.0 | 3.2 - 6.0 | |
Diameter(mm) | 40/48mm 48/56mm 48/60mm | ||||
Thickness(mm) | 1.6 | 1.8 | 2.0 | 2.5 | 3.0 |
Our Advantage
Our Advantage
1. Energy saving and environmental protection, save 2/3 steel than bowl button scaffolding .
2. Hot dip galvanizing process, the service life for more than 15 years.
3. New carbon steel, high strength mechanical properties, pole load up to 200KN.
4. Gravity self-locking,can prevent ledger slippage effectively,make the construction more safety.
5. Easy to remove the tower, save time and effort, the tower speed of the steel pipe fastener scaffolding 4 to 8 times, for the bowl buckle scaffolding 2 times.
6. Standard modules, efficient management, easy to transport and construction management, reduce the risk of loss damage.
Our Company
JET has been established in Guangzhou,China.
We offer services with material of high standard undisputed quality services with competitive rates.and we provide complete solutions of scaffolding and formwork system to the construction industry.
Our varied products mix of Ringlock system,Frame system,Steel plank,Steel prop,Scaffolding pipe and all kind of couplers, with high quality for commercial and industrial construction industries.
Many of our client base are returning customers whom we have known and worked for many years.
Our products have enjoyed great popular at home and abroad,Such as America,Australia,Europe,the Middle east and so on.
1. Question: What's your MOQ(minimum order quantity)?
Answer: One full container.
2. Question: What's your packing methods?
Answer: Packed into bundle, and rest in bulk.
3. Question: What's your payment terms?
Answer: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/ C 100%, or negotiate according to the order status.
4. Question: What's your delivery time?
Answer: 10-20 days after received the advance payment or L/C.
5. Question: Are you manufacturer or trader?
Answer: We are the munafacturer of SCAFFOLDINGS MATERIALS for decade years. Our group company has 8 subsidiaries and 4 factories, coveraged every scaffolding systems.
6. Question: Where's your factory?
Answer: Our factory is in Tianjin city (near Beijing) and Jiayu city, Hubei Province, afforded enough production ability and earlier delivery time.
7. Question: Can we visit your factory?
Answer: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
8. Question: Can you supply other scaffolding materials?
Answer: Yes. All related scaffolding materials.
(1) scaffolding system (cup-lock system, ring lock system, frame, pipe&coupler system)
(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized/ black. BS1139, STK500
(3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)
(4) steel coupler (preesed / drop forged coupler)
(5) steel plank with hooks or without hooks
(6) steel stair case