Modern Prefabricated Steel Buildings , H Section Premade Metal Buildings

Brand Name:TPA Housing
Certification:ISO,SGS,BV
Model Number:TPA-PSS1
Minimum Order Quantity:50 square meters
Delivery Time:5-8 work days
Payment Terms:T/T, L/C at sight
Contact Now

Add to Cart

Verified Supplier
Location: Foshan Guangdong China
Address: Lishui Town, Nanhai District,Foshan Guangdong,China
Supplier`s last login times: within 4 hours
Product Details Company Profile
Product Details

Modern Design H Section Steel Prefabricated Structure Building


About this building


Whether you’re expanding your current business or starting a new venture in the industrial sector, a metal or steel building from TPA Housing steel structure building is your solution. At the core of our success is a team of dedicated, skilled engineers who will provide you with a high quality product. They will take the time to help you design and achieve your vision. Industrial buildings such as warehouses, welding shops and heavy equipment storage facilities require durability and that’s exactly what you get when you purchase one of our steel buildings. No building is too large and no requirement is too complex.



Features

  • Avoids the need for a masonry shaft
  • Loads transmitted to the lift pit floor
  • Variety of cladding options from steel panels to glass feature panels
  • Reduced installation times
  • Simplifies building programme

Drawings & Quotation?


If you have drawings, we will provide quotation according to it. If have not drawings, pls confirm the following information:


Size: Length* Width*Height (eave height)

Local climate: Wind speed(km/h),snow load(kg/m2), rain load,seismic magnitude?

Wall and Roof: Steel sheet or sandwich panel (insulation material)?

Door and Windows: Size and quantity? Sliding door or rolling door, aluminum or PVC windows?

Other needs: Gutter, Down Pipe, Skylight Panels, Fan? Mezzanine or not? And usage?

Crane: If have, pls tell me the crane span, crane lift height, max lift capacity.

A steel structure building can also be used for:

1) Industrial Buildings
2) Manufacturing Facilities
3) Warehouses
4) Construction Equipment Storage
5) Machinery Storage
6) Tool Storage
7) Warehouse Expansion
8) & More, tell us about your needs here!

What's the Standard Packing?


1. Packing the pipes into the bundles by the steel strip
2. packing the welded steel structure parts by some fabric
3. packing the small parts by bags and EPS foam
4. packing sets parts by some box
5. Load in to 40ft HQ,20ft GP or 40OT

Loading pictures reference


Door and window will packed safety to prevent damage. We will reponsible for all missing components and wrong parts. We will provide insurance services for shipment to avoid any mistakes.


Steel Structure Building materials and accessories


Production processing


We’d love to hear from you, get in touch with us!

China Modern Prefabricated Steel Buildings , H Section Premade Metal Buildings supplier

Modern Prefabricated Steel Buildings , H Section Premade Metal Buildings

Inquiry Cart 0