

Add to Cart
1. It is fast-assembly forced circulating oil/gas fired boiler with
large heating area and compact structure.
2. The heating area is formed by the closely arranged coils from
the inside, middle and outside directions. The inner coil is
radiation heating area. The middle and outside coils and the the
inner coil surface form the convection heating area.
3. The fuel is fired and releases heat in the combustion chamber
that formed by inner coils. After taking in most heat through
radiation heating area, the high temperature smoke will be into the
convection heating area and exchanges heat.
4. It has the four-return design with high efficiency, which can
realize the comprehensive evenly heating- up with low thermal
inertia.
5. The air goes into the boiler from the air inlet of the burner of
the boiler’s front part, and then reaches to the back part and
involves into firing through the clamp cover of between the inner
and outside layer of heat-carrier boiler. In this process the air
forms into four returns and finally is injected through the
chimney.
Type | YYW0.24 | YYW0.35 | YYW0.6 | YYW0.9 | YYW1.2 | YYW1.5 | YYW1.8( | YYW2.5 | YYW3 | |
Rated thermal | 0.24 | 0.35 | 0.6 | 0.9 | 1.2 | 1.5 | 1.8 | 2.5 | 3.0 | |
Thermal efficiency(%) | 90 | 90 | 90 | 90 | 90 | 90 | 90 | 90 | 90 | |
Rated steam | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | |
Maximum working | 350 | 350 | 350 | 350 | 350 | 350 | 350 | 350 | 350 | |
Capacity(m³) | 0.21 | 0.25 | 0.28 | 0.44 | 0.64 | 0.793 | 1.25 | 1.76 | 1.90 | |
Circulating oil(m³/h) | 40 | 40 | 80 | 80 | 80 | 100 | 100 | 200 | 200 | |
Piping connection | 100 | 100 | 100 | 100 | 125 | 125 | 125 | 150 | 150 | |
System installed | 14 | 14 | 22 | 22 | 40 | 40 | 40 | 66 | 70 | |
Size | Diameter | 1016 | 1016 | 1216 | 1416 | 1716 | 1716 | 2000 | 2000 | 2000 |
Height | 2050 | 2350 | 2450 | 2900 | 3300 | 3900 | 4100 | 5100 | 5300 |
Basic Information:
Product or Series (we sell): Grade B Boiler (Steam Boiler, Hot
Water
Boiler, Thermal Oil Heater)
Brand: YINCHEN
Number of Employee: above 350
Factory Size: more than 60,000square meter
Factory Location: Henan Taikang County Industry Cluster
Number of Production Lines: above 10
Customer Visiting
Consultation service: Experienced technicians guidance is available on the phone, and on
the internet.
Installation service: One or more engineers will be dispatched to the installation site
to help install the customers’ boilers.
Training service: We also provide necessary training about boiler operation and
daily maintenance to local workers.
Warm service: Based on customers’ request and budget, our experts make
efficient, reliable solutions, and we produce strictly following
customers’ order. Every customer has the chance to visit our
workshops before placing the order.
Do you have other worries ? send to US .