TORICH is an enterprise that has been producing precision steel pipes and steel pipe processing for over 20 years, with a factory area of approximately 20000 square meters


Add to Cart
GB/T8163 Seamless Steel Tube for Liquid Transpotation 20 Q345
Steel Grade:10#/20#/Q295/Q345/Q390/Q420/Q460
Application of Seamless Steel Tube: for Liquid Transpotation
Production method: Hot - rolled /Cold - drawn /cold - rolled)
Technical Specifications :
Steel tubes are made of Grade 10, 20, Q205, Q345 steel.
Steel tubes of other grades can be produced as required by the
client and through mutual discussion between the client and the
supplier.
Method of manufacturing :
hot-rolled (extruded and expanded) and cold-drawn (cold-rolled)
Steel shall be made by electric furnace, Martin furnace or oxygen
converter. When the client specified a certain method of
manufacturing, it shall be indicated in the contract.
Steel tubes shall be manufactured by hot-rolled (extruded and
expanded) and cold-drawn (cold-rolled) seamless process. When the
client specified a certain method of manufacturing, it shall be
indicated in the contract.
Delivery status:
Hot-rolled (extruded and expanded) steel tubes are delivered in
hot-rolled or heat-treated status while cold-drawn (rolled) steel
tubes are delivered in heat-treated status.
Process Test:
Flattening test
Expanding test
Bend test
Hydrostatic pressure test
Surface quality:
No crack, folding, rolled scrimp, separation layer and scab are
allowed to exist. These defects shall be completely removed and the
removal depth shall not exceed the negative tolerance of the
nominal wall thickness.
Longitudinal Mechanical Properties of Steel Tubes
Permissible Tolerance of Outer Diameter and Wall Thickness (mm)
Product Name | Hot - Rolled Seamless Steel Tube For Liquid Transportation 20 10# /
20# / Q295 |
Material | alloy steel |
Section Shape | Round |
Standard | GB/T8163 |
Grade | 10#/20#/Q295/Q345/Q390/Q420/Q460 |
Brade | Torich |
Packing Details : In bundles with seaworthy packing of structural steel pipe
Delivery Details : 3-4 weeks
A: We are factory.
A: It is according to quantity. And usually is 35-50 days after receiving 30% T/T in advance.
A:
1.You are requested to pay for sample charges and courier charges
from China to your country; and the free sample is according the
product like size, steel grade and quantity, please consult our
sales for details
2.Sample charges will be refunded when order is placed.
A:
1.T/T: 30% deposit in advance, the balance 70% paid before shipment
2.30% down payment, the balance 70% paid against L/C at sight