ASTM A210 Seamless Medium Carbon Steel Boiler And Superheater Tubes

Certification:ISO 9001 ISO14001 TS16949
Minimum Order Quantity:negotiable
Place of Origin:Zhejiang, China (Mainland)
Price:negotiable
Standard:ASTM, ASTM A213
Standard2:ASTM A210-1996
Contact Now

Add to Cart

Verified Supplier
Location: Jiaxing Zhejiang China
Address: INDUSTRY AREA -HAIYAN ,JIAXING CITY ,ZHEJIANG ,CHINA
Supplier`s last login times: within 29 hours
Product Details Company Profile
Product Details

ASTM A210 Seamless Medium Carbon Steel Boiler And Superheater Tubes


ASTM A210 Seamless medium carbon steel boiler and superheater tubes


Applications: for Boilers,Superheaters,Steam linepipes of boilers


Size range: O.D.:12.7-127mm W.T.:1-15mm L: according to customer requirement

Carbon steel marterial sa 210 gr.a1 seamless boiler tube condenser tubes

Steel Grade and Chemical Compositions:
GradeCMnPSSi
A-1≤0.27≤0.93≤0.035≤0.035≥0.10
C≤0.350.29-1.06≤0.035≤0.035≥0.10


Mechanical properties:

GradeYield Point
Mpa(ksi)
Tensile Strength
Mpa(ksi)
Elongation
A-1≥255(37)≥415(60)≥30%
C≥275(40)≥485(70)≥30%

Tolerance for OD and WT(SA-450/SA-450M)
OD in(mm)+-WT in(mm)+-
<1''(25.4)0.100.10≤1.1/2''(38.1)20%0
1''~1.1''(25.4~38.1)0.150.15>1.1/2''(38.2)22%0
>1.1/2''~<2''(38.1~50.80.200.20
2''~<2.1/2''(50.8~63.5)0.250.25
2.1/2''~<3''(63.5~76.2)0.300.30
3''~<4''(76.2~101.6)0.380.38
4''~<7.1/2''(101.6~190.5)0.380.64
>7.1/2~9''(190.5~228.6)0.381.14

Surface Condition:

Pickling or shot blasting, Passivated, Black Phosphating.

Tests and Inspection:

Flattening Test

Flaring Test

Hardness Test

Hydrostatic or Nondestruction Electric Test ( Eddy Current and Ultrasonic Testing)

Carbon steel marterial sa 210 gr.a1 seamless boiler tube condenser tubes

heat exchangestainless steel pipe


QUALITY CONTROL

1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.


Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample of Carbon steel marterial sa 210 gr.a1 seamless boiler tube condenser tubes for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us














China ASTM A210 Seamless Medium Carbon Steel Boiler And Superheater Tubes supplier

ASTM A210 Seamless Medium Carbon Steel Boiler And Superheater Tubes

Inquiry Cart 0