Cold Drawn Hot Finished Seamless Tube , Structural Cold Rolled Steel Pipe

Certification:ISO9001, ISO14001, TS16949
Minimum Order Quantity:negotiable
Place of Origin:Zhejiang, China (Mainland)
Price:negotiable
Standard:ASTM, BS, DIN, GB, JIS
Standard2:ASTM A513-2007, BS 6323, BS EN10025, DIN EN 10305, GB/T 17396-1998, GB/T 3639-2000, GB/T 8713, JIS G3464-2006
Contact Now

Add to Cart

Verified Supplier
Location: Jiaxing Zhejiang China
Address: INDUSTRY AREA -HAIYAN ,JIAXING CITY ,ZHEJIANG ,CHINA
Supplier`s last login times: within 29 hours
Product Details Company Profile
Product Details

cold drawn precision hot finish carbon steel seamless pipes


Standard : GB/T3639, GB/T8713, EN10305-1:2002, EN10305-2:2002,
ASTM A519-2006, ASTM A513-2007, GB/T1591-2008, GB/T17396-2009

hot finish carbon steel seamless pipes
Material: 20#, 45#, Q345B, Q345D, 25Mn, 27SiMn, E355


Type: Hydraulic Cylinder Tube

I.D.: 40-400mm

W.T.: ≥5mm

Length: Up To 12000mm According To Customer's Requirement

Surface Treatment: As Customer's Required
Place Of Origin: Zhejiang, China (Mainland)



Detailed Images

QUALITY CONTROL

1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.


Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us












China Cold Drawn Hot Finished Seamless Tube , Structural Cold Rolled Steel Pipe supplier

Cold Drawn Hot Finished Seamless Tube , Structural Cold Rolled Steel Pipe

Inquiry Cart 0