

Add to Cart
Solar Panel Frame Make Machine Strut Channel Roll Forming Machine
Hydraulic Punch
1. Description of strut channel roll forming machine
The strut is usually formed from the metal sheet, folded over into
an open channel shape with inward-curving lips to provide
additional stiffness and as a location to mount interconnecting
components. Strut usually has holes of some sort in the base, to
facilitate interconnection or fastening strut to underlying
building structures.
The main advantage of strut channel in construction is that there
are many options available for rapidly and easily connecting
lengths together and other items to the strut channel, using
various specialized strut-specific fasteners and bolts.
The solar strut channel roll forming machine is designed for
producing the main sizes of different strut channel supports. The
whole machine unit main including Uncoiler, Entry Beach, Punch
unit, Roll Forming Unit, Shearing Mechanism, Hydraulic System,
Electric Control System.
2. Major technical parameters of strut channel roll forming machine
No. | Item | Description |
1 | Frame | 400# H steel |
2 | Drive mode | differential box transmission |
3 | Material of rollers | GCr12MoV |
4 | Material of shafts | 45# steel with tempering |
5 | Diameter of shafts | φ80mm |
6 | Number of rollers | 20 rollers |
7 | Main power | 22kw |
8 | Forming speed | 10m/mins |
3. Introduction of main components of strut channel roll forming
machine
No. | Item | Description |
1 | Manual Uncoiler | Usage: It is used to support the steel coil and uncoil it in a
turntable way. |
2 | Entry Beach | Usage: Put the raw material (steel plate) through the beach to manufacture and process, it can guarantee that the products are neat, parallel and everything is uniformity. Please refer to the equipment regulation to know the function of locating angle iron. |
3 | Punching system | Hydraulic punching, using the material of CR12, contribute with
weld. |
4 | Main Roll Forming System | Feature: Ensure stability, precision and lifetime. |
5 | Shearing Mechanism | Feature: Ensure stability, precision and cutting speed |
6 | Hydraulic system | Hydraulic oil: 46# |
7 | Electric Control System | Feature: |
8 | Counter | One counter gauges length, pulses, and decides length. |
4. Installation service
a. After the machine arrives at the destination, the seller will
send the technician to the buyer’s factory to install the machine
if the buyer wants. The buyer needs to provide some technicians to
assist in the installation work.
b. Installation period is around 5 days. The buyer should have been
prepared for the steel sheet, foundation position the machine
before seller’s technician's departure.
c. The buyer should arrange the accommodation, food, and traffic in
the destination
d. Training period: 2 days. (we can supply training on the
operation spot if buyer needs)
e. Within 3 months after the arrival of the goods at the port of
destination, if there is no installment requirement from the
Buyers, the goods should be counted as up to standard. Inspection
standard is based on the technical standard signed by both parties
and our company standard.