Galvanized Light Steel Keel Roll Forming Machine , Light Steel Keel Making Machine

Brand Name:Lebron-Machinery
Certification:ISO9001: 2008
Model Number:LBM-LSK-008
Minimum Order Quantity:1 Set
Delivery Time:20 work days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Active Member
Location: Wuxi Jiangsu China
Address: 1604#, Yangming Sicence & Technology Industry Center, No.855 Nanhu Avenue,Wuxi city, Jiangsu, China
Supplier`s last login times: within 25 hours
Product Details Company Profile
Product Details

Steel Frames Ceiling drywall Light Steel Keel Roll Forming Machine Delta PLC Control​


1. Description of light steel keel roll forming machine


Now, in the modern building project, light steel keels are more and more widely used. The ceilings and drywall roll forming machine, or even all the lightweight or light gauge steel frame roll forming machines are highly popular in the international.


A light steel keel roll forming machine has been designed for the automatic manufacturing of the light steel keels continuously for light gauge or lightweight steel building systems.


The complete Light Steel Keel Roll Forming Machine including the Decoiler, Main Roll Forming Machine, The PLC control system and Ran-out tables. The roll forming machine equipped with a PLC computer control system. You just need to program in the computer the piece and length data, then the roll forming machine produces it automatically.


2. Main technical parameters of the light steel keel roll forming machine


Technical Parameters:
1Name of commodity & specificationLight Steel Keel Roll Forming Machine
2Main motor power5.5 KW
3Hydraulic motor power3 KW
4Hydraulic Pressure10-12MPa
5Voltage380V /3phase/ 50 HZ (can custom)
6Control SystemPLC Delta Converter
7Main Frame300mm H-Beam
8Backboard Thickness18mm
9Chain Size20mm
10Feeding Materialcolor steel coils
11Feeding Thickness0.3-1.0mm
12Productivity12m~20m/min
13Roll Station11 or custom
14Roller Diameter70mm
15Roller material45# steel
16Cutter materialCr12 , quenched
17Cr-Plating Size0.05mm
18Overall Size3.0×0.8×1.0m
19Total Weight3T

3. Main technical parameters of stud and track roll forming machine


No.ItemQuantity (Set)
1Manual Uncoiler1
2Guiding Platform1
3Coil Strip Leveler1
4Main Machine of Roll Forming1
5Electric-Motor1
6Cutting Device1
7Hydraulic Station1
8PLC Control1
9Supporter Table1

4. Installation service


After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.


Installation period is around 5 days. The buyer should have been prepared for the steel sheet, foundation position the machine before seller’s technician's departure.


The buyer should arrange the accommodation, food, and traffic in the destination


Training period: 2 days. (we can supply training on the operation spot if buyer needs)


Within 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. Inspection standard is based on the technical standard signed by both parties and our company standard.





China Galvanized Light Steel Keel Roll Forming Machine , Light Steel Keel Making Machine supplier

Galvanized Light Steel Keel Roll Forming Machine , Light Steel Keel Making Machine

Inquiry Cart 0