

Add to Cart
Blue Color Fully Automatic Door Frame Roll Forming Machine High
Stability
1. Description of Door Frame Roll Forming Machine
We often see many exquisite door frames in our lives, so door frames are used to install door leaves. In the past, ordinary doors had door frames. Now in the fine decoration, the door with plutonium is installed directly on the keel of the door cover without a frame.
The Door Frame Roll Forming Machines can be divided into three categories: ordinary door frame forming machines (one-time), door frame half forming machines (adjustable), and fully automatic door frame forming machines.
Among them, the door frame semi-forming machine (adjustable type) is special. Its characteristic is that the double-sided door frame is formed. Two kinds of lace sizes in the above product specifications can be selected, and the pattern is optional;
The key part of the whole machine-the roller is designed by computer AutoCad, UG simulation, CNC lathe processing, and then subjected to high temperature quenching treatment.
Process flow of door frame forming machine:
Uncoiling -- leveling&feeding -- continuous punching -- roll forming -- fixed-length cutting--receiving
2. Technical Parameters of Door Frame Roll Forming Machine
Weight | About 8000kgs |
Size | About 7.5m*1.2m*1.0m (L x W x H) |
Suitable Material | Galvanized steel strip |
Thickness | 0.8~1.2mm |
Coil width | 240mm |
Yield strength | 235Mpa |
Rollers station | 18 Stations |
Roller Shaft Diameter | 75 mm |
Roll Forming Speed | 20-25m/min |
Production Speed | Approx.15m/min |
Roller Material | 45# steel, coated with chrome, quenched |
Cutter material | Cr12 mold steel, with quenched treatment |
Controlling system | PLC and Converter |
Electric power requirement | Main power: 7.5 KW |
Hydraulic power: 4 KW | |
Electric voltage | 380V 50Hz 3 Phase (as per local requirement) |
3. Our Service
Installation service
After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.
The installation period is around 5 days. The buyer should have been prepared for the steel sheet, foundation position the machine before the seller’s technician's departure.
The buyer should arrange the accommodation, food, and traffic in the destination
Training period: 2 days. (we can supply training on the operation spot if buyer needs)
Within 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. The inspection standard is based on the technical standard signed by both parties and our company standard.
4. FAQ
Q: How to maintenance?
A: If using frequently, best coating lubricant on the chain and two ends of the shaft every month, replace the hydraulic oil every 1-2 years.
Q: Can you be responsible for transport?
A: Yes, please tell me the destination port or address. we have rich experience in transport.
Q: Can you make the machine according to my design or phototype?
A: Yes. We have an experienced team for working out the most suitable design and production
Q: Can you supply the raw materials?
A: Yes, we can supply the galvanized steel coil, aluminum steel coil, color steel coil
Q: How is this machine's service life?
A: In normal maintenance, the service life is at least 10 years.