

Add to Cart
IBR Sheet Roll Forming Machine Double Layer Roll Forming Machine
1. Description
Compared to a single layer roof panel roll forming machine, this double layer roll forming machine is designed to produce two different kinds of metal sheets which can be one trapezoidal roofing and one metal roof tile
It shall be pointed out that the two layers of roll forming parts on this double layer roll forming machine cannot work at the same time, which means each one of the roll forming systems (top roll forming and bottom roll forming) will stop when the other is working.
The double-layer roof sheets are rolled and molded, which are both solemn and elegant, and are beautiful. The appearance is smooth, the ripple is uniform, the utilization rate is high, the strength is high, the production automation is high, the cost is low and durable. Double-layer tile machine products are widely used in large and medium-sized enterprises of civil construction, such as plants, garages, hangars, stadium exhibition halls, theaters, and so on.
2. Technical Parameters
Suitable Material | Type | PPGI/GI/PPGL Coil |
Thickness | 0.3-0.8mm | |
Wide | 914mm/1000mm/1200mm/1250mm/1450mm | |
Yield Strength | 230~550Mpa | |
Power Specs | Voltage | 380V/3PH/50HZ, accept customization |
Main Motor | 7.5kw | |
Hydraulic motor | 4kw | |
Hydraulic pressure | 10-12MPa | |
Machine Specs | Forming steps number | 16~22 steps |
Shaft Material | 45 # steel tempered, 70mm | |
Roller Material | 45 # steel coated with hard chrome | |
Main machine body | 350# H steel welded | |
Transmission | Chain and Sprocket, chain size 1.5 inch | |
Wall Plate | 18mm thickness | |
Blade material | Cr12 mold steel with quenched treatment 60-62 | |
Forming Speed | 0-12m/min for a standard solution | |
Cutting system | Length-set cutting after roll formed | |
Control System | Delta PLC and Converter | |
Manual decoiler | Max width of coiling: 762~1250mm Max weight of loading: 5000kg | |
Output Supporter | 2 Pcs Simple Supporter | |
Dimension of the machine | 7.5m*1.5m*1.2m (L*W*H) | |
Weight of the machine | 6 ton |
3. Our Service
Installation service
a. After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.
The installation period is around 5 days. The buyer should have been prepared for the steel sheet, foundation position the machine before the seller’s technician's departure.
The buyer should arrange the accommodation, food, and traffic in the destination
Training period: 2 days. (we can supply training on the operation spot if buyer needs)
Within 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. The inspection standard is based on the technical standard signed by both parties and our company standard.
4. FAQ
Q: How to maintenance?
A: If using frequently, best coating lubricant on the chain and two ends of the shaft every month, replace the hydraulic oil every 1-2 years.
Q: Can you be responsible for transport?
A: Yes, please tell me the destination port or address. we have rich experience in transport.
Q: Can you make the machine according to my design or phototype?
A: Yes. We have an experienced team for working out the most suitable design and production
Q: Can you supply the raw materials?
A: Yes, we can supply the galvanized steel coil, aluminum steel coil, color steel coil
Q: How is this machine's service life?
A: In normal maintenance, the service life is at least 10 years.