Edm Wear Parts Precision Metal With SAARA TA Material Certification/edm machine parts/mitsubishi wire edm parts

Brand Name:Yansong
Certification:ISO9001:2008
Model Number:XZ-096
Minimum Order Quantity:1 Pcs or as your request.
Delivery Time:Normally, simple parts, 5-7 days, complicated parts, 7-15 days. According to QTY and the complexity of drawing.
Payment Terms:T/T 50% as deposit 50% before shipment
Contact Now

Add to Cart

Active Member
Location: Dongguan Henan China
Address: #201, Building A, No.15, Zhenan West Road, Xiabian Community, Chang 'an Town, Dongguan City China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

Edm Wear Parts Precision Metal With SAARA TA Material Certification

Introduction
1. Material capabilities: Aluminum, stainless steel, copper, tungsten, or according to samples or drawings.
2.Type: Milling, turning, wire EDM, grinding and other machining services,.
3. Surface treatment: Plating, powder coating, black treatment, mirror polishing, plc coating, and so on.
4. Equipments: CNC milling machine, EDMputer and phone connector, auto and so on.
6. QC: Check every process before machine,grinder, wire cutting machine, EDM.

5. Application|: Medical equipment,electrical, automobile.
7. Tolerance: 0.005-0.02 mm
8. Advantages: High precision

9. Our mangement: Skilled workers and rich experiencd staff
10. Our Price: Factory direct price

Product Description

Available Material Brand


Available Material

ASSAB

XW-5/ASP23/8407, etc.

DAIDO

PD613/SS400/SKS93, etc.

BOHLER

W403/W330/S790, etc.

AISI

CPMM4/M42/M2,etc.

SAARS TA

2842/3343/2510,etc.

Processes


Surface treatment (finish)

CNC machining(Milling/Turning),

Polish

Grinding

PVD coating

EDM, Wire cutting

DLC coating

Equipment


Quality control

CNC machining centers

2.5D projector
CNC turning centers / GrindersJapan Nikon Height Gauge, hardness meter

EDM machines etc.

Third party inspection available if required

Lead time & Packing


Application

Usually 5-15 days

Automotive industry / Telecom equipment
3~7 days via express: DHL, FedEx, UPS, TNT, etc.Medical
PE film covered first, Plastic box, then carbon last.Aviation, etc.


Dongguan Yansong Automation Technology Co Ltd.Mainly produces precision stamping dies molds and parts .
we can do 0.001 mm minimum tolerance Ra 0.005 minimum polished and cutting wires lowest possible Ra0.035 .Cut the minimum line width is 0.13.parts are widely used in Automobile: auto connector mold parts
Medical: medical equipment connector mold parts
Electrical: computer connector mold parts, mobile connector mold parts and so on.

Testing Equipment in Yansong
We have built quality checks in each and every step of the manufacturing process. Stringent process control are employed right from incoming material, up to final inspection of the finished goods. we are equipped with a full set of quality control equipment. Coupled with highly skilled manpower for judgement and expertise, we try to eliminate non-conformance product in achieving zero defects.

  • Micrometer : 10 units
  • Dial Caliper : 15 units
  • Block Gauge : 5sets
  • Pin Gauge (0.30 - 10 mm) : 3 sets
  • Dial Indicator : 10 units
  • Height Gauge Indicator : 8 units
  • Height Indicator (Trimos) : 5unit
  • Two Dimesions : 5 units
  • Microscope (Nikon) : 5 unit
  • Profile Projector (NIKON) : 4 unit


Our Services from Dongguan Yansong Automation Technology Co Ltd.

A: The Japanese materials in our company are purchased from Japan’s first level agent in China. Swedish materials are purchased from China ASSAS and Germany materials are purchased from Shanghai Xinchang with material certificate provided by the first level agent in shipment. Our company believes in the management philosophy of“integrity first

B: The delivery cycle is generally 5~15 working days mainly according to the quantity and the degree of drawing. If it is particularly urgent for you, we arrange urgent order and try to solve problems .for you during the shortest lead time. We would usually use DHL for international in delivery. The clients can usually get the goods at the third day after shipment. If there occurs damage or missing, we will be responsible. In fact, DHL’s service is the best and we basically do not need to worry about it.
C: Please rest assured that all our products are QC inspected and accepted with inspection report before delivery and generally there will no non-conformance; in case of non-conformance, we will have them reworked or repaired at the first time

If you have any questions, you can contact us anytime.










































China Edm Wear Parts Precision Metal With SAARA TA Material Certification/edm machine parts/mitsubishi wire edm parts supplier

Edm Wear Parts Precision Metal With SAARA TA Material Certification/edm machine parts/mitsubishi wire edm parts

Inquiry Cart 0