

Add to Cart
Ease Operation Small Mud Pump , Portable Mud Pump For Water Well Drilling
BW-160 mud pump brief introduction
The BW-160 mud pump is a horizontal ,three-cylinder single-acting ,reciprocal piston pump, It is mainly used to supply flushing fluid to the drilling well in engineering drill’s bedrock drilling or exploratory drilling . Its shell is A-alloy, so it is lightweight. The pump has two speed and is easily operation.
BW-160 mud pumpTechnicial parameter
No. | Name | Technical Parameters |
1 | Model | BW-160 |
2 | Number of cylinders | 1 |
3 | Cylinder diameter | 95mm |
4 | Piston stroke | 85mm |
5 | Frequency | 165 time/min |
6 | Theoretical flow | 160 L/min |
7 | Rated pressure | 1.3Mpa |
8 | Volume efficiency | 88% |
9 | Belt wheel speed | 951rpm |
10 | Power | 5.5kw/8HP |
11 | Inlet inside diameter | 42mm |
12 | Outlet inside diameter | 32mm |
13 | Weight(including power) | 200kg |
14 | Dimension | L1110xW725xH965mm |
BW-160 mud pump Description
1. BW series cement grout injection pump is horizontal triplex
grout pump with high stability and high pressure.
2. Eight gear shift to adjust the flow, large output capacity,
simple operation.
3. High quality pump parts, less wearing parts, long service life,
low construction cost.
4. Fast suction-discharge speed, high pump efficiency.
5. Less noise and dust, environmental operation.
Scope of use of mud pump
Multi speed variable transmission, energy saving, compact
structure, light weight, high efficiency, durability, safe
operation, convenient maintenance, and low maintenance costs. This
type of pump is mainly used for geological drilling, geological
engineering construction support, and low and medium pressure
grouting pumps for foundation treatment. It has been widely used in
geological, coal, construction, metallurgy, chemical, railway,
water conservancy, petroleum and other industries. Grouting
reinforcement is a concealed project, and the complexity of its
geological conditions determines the difficulty of its
construction. Therefore, it must be supported by scientific
construction techniques, material formulas, and construction
machinery, while also emphasizing the importance of construction
experience. The successful practice of this engineering project has
received guidance and supervision from relevant personnel from
Party A, the design party, the supervision party, and the technical
personnel of the project department.