50-100 Meter Diesel Mining Drill Rig , Portable Core Drilling Machine

Brand Name:Shitan
Certification:ISO9001
Model Number:XY-1
Minimum Order Quantity:1 set
Delivery Time:5-8 work days
Payment Terms:L/C, T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Jinzhou Hebei China
Address: Xiaoshang Industrial Zone, Jinzhou City, Hebei Province, China
Supplier`s last login times: within 28 hours
Product Details Company Profile
Product Details

50-100 Meter Portable Water Well Drilling For Home Drilling


Product description


1. It is portable type drilling machine, easy operation, two or three people can do the drilling themselves.

2. This type water well drilling machine is widely used in home drilling, basically they can get one well in two days( for drilling 100 meters )

3. It is also used in geological investigation, to make sure the buliding foundation more stable.

Product technical data
XY-1 Type
DrillSwivel Head

Drilling depth


Max.100

Spindle speed


142,285,570(r/min)


Hole diameter


Max.110mSpindle stroke450kmm
Drill rod diameter42mmSpindle pull-downMax.15KN
Angle range90°~75°Spindle lifting capacityMax. 25KN
Oil pumpWater pump
ModelYBC-12/80ModelGear oil pump
Rated pressure12.5MpaWorking pressure0.7-1.2Mpa
Flow speed8ml/r
Rated speed800-2500r/min
HoistPower(diesel)
Max. lifting capacity10KNModel(diesel engine1105
Hoisting drum revolution55,110,220(r/min)Rated power12.1KW
Drum diameter145mmRated speed2200 r/min
WEIGHT500kg
SIZE1640*1030*1440mm

Product Features
1. The oil pressure feeding mechanism can improve drilling efficiency and reduce the labor intensity.

2. A ball mounted card blessing mechanism replaces the chuck which can carry out without stopping the lever, easy to operate, safe and reliable.

3. Handle concentration, easy operation.

4. It is compact.The drill, water pump and diesel engine are installed on the same base, which occupies a small area.

5. It is light in weight, strong in decomposition and easy to remove .And it can be used in plains and mountains

Precautions for operation of water well drilling rig:

1. Before drilling, the drilling rig must strictly follow the hole position, orientation, angle, hole depth, etc. for construction
2. Ensure that the drill pipe is not blocked, bent, or cracked during installation.
When using clean water drilling, water should not be supplied before drilling, and pressure drilling can only be carried out after the water returns. Sufficient flow rate should be ensured, and dry drilling is not allowed. When there is a lot of rock powder in the hole, the water volume should be increased to extend the pump start time, and drilling can only be stopped after effectively flushing the hole.
4. During the drilling process, the distance must be accurately measured. Generally, the drill pipe must be measured every 10 meters of drilling or when changing the drilling tool, the hole depth must be verified, and relevant records must be kept. 5. Check if there is any overheating or abnormal sound in the gearbox, shaft sleeve, horizontal and vertical shaft gears, etc. When a problem is found, it should be stopped immediately for inspection and the cause should be found and dealt with in a timely manner. Do not leave the problem unsolved, as it accumulates over time and causes rapid mechanical damage, with high maintenance costs.
China 50-100 Meter Diesel Mining Drill Rig , Portable Core Drilling Machine supplier

50-100 Meter Diesel Mining Drill Rig , Portable Core Drilling Machine

Inquiry Cart 0