Add to Cart
Professional Produce Anti Corrosion Materials 1250kw dummy load
bank
Product Description
The system consists of 1 sets of AC400-1250KW load bank. The system
is made up of two parts of measurement and control and load, mainly
including the tank dry type ac load, automatic data acquisition
system, automatically loading and unloading control system, the
cooling device, auxiliary control, remote control box and PC
software and so on.
Technical Parameter
Rating Voltage/Frequency | 400VAC/50Hz, 3 phase 4 wire |
Rated Power | Resistive load:1250kW |
Installed Capacity | Resistive load: 1250kW |
Load Step | 1,2,2,5,10,20,20,50,50,,100,200,200,200,200,200kW, min step load: 1kW |
PF(Power Factor) | 1 |
Load Tolerance (each step) | ±5% |
Load Tolerance(overall) | ±3% |
Display Precision | 0.5 class |
Control Power | 380VAC 50Hz |
Wire Connection | Load power supply input——Copper bar (star coupling “Y”) |
Insulation | F |
Way of Working | Continuous Working |
Casing Dimensions and Cooling | about 2600*1400*1800mm(length*width*height) Forced air cooling,Horizontal inlet air and vertical cooling |
Weight | About 2000 kgs / set |
Transportation | Hoisting, there are lifting lug in top of casing, also the wheel casters can be provided |
Casing Color | Grey(RAL7035)or as you required |
Workplace | Outdoor |
Ambient Temperature | -10℃~+50℃ |
Relative Humidity | ≤95% |
Altitude | ≤1500 meter |
Atmospheric Pressure | 86~106kPa |
Contactor | Schneider |
Fuse | DELIXI |
MCU | INFINEON |
Data processing software | Kaixiang(self-developed) |
Alloy Resistance | Kaixiang(self-developed |
Product Advangent
The system can be used with a computer to realize the intelligent
control, automatically completing the special test to all
electrical parameters of generating set and generating tables,
graphs, and supporting the print, comprehensively from the
cumbersome manual operation to provide scientific and efficient
detection means for the power generating sets
Application:
As the generator loading system
Periodic running test for standby generator
UPS inspection and maintenance
Ship battery charging/discharging system testing
The acceptance of new system and testing of servicing equipment