10.5 KV Generator Load Bank Real Time Monitor For Sea Trial Test

Brand Name:KAIXIANG
Certification:ISO9001
Model Number:5000 KW
Minimum Order Quantity:ONE SET
Delivery Time:ONE MONTH AFTER GET DEPOSIT
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Active Member
Location: Shijiazhuang Hebei China
Address: No33 Wangshan Road, Green Island Economic Development Zone, Shijiazhuang, China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

For Sea Trial Test Accurate Generator 10.5 KV Load Bank Real Time Monitor

Product Description

The system can accurately test the output power and load capacity of various generator sets.The system consists of two parts of measurement and loading, including AC load bank, data acquisition system, automatic load and drop control system, cooling device, auxiliary control,PC software,and so on.The user can freely select local control or software control to operate the load bank


Technical Parameter

Rating Voltage/Frequency10500V/50Hz, 3 phase 3 wire
Rated power

Resistive:2500kw

Inductive:1250kvar

Capacitive:1250kvar

Load Resolution

Resistive:100.200.400.500.500.800kw

Inductive:50.100.200.250.250.400kvar

Capacitive:50.100.200.250.250.400kvar

PF(Power Factor)-0.9-1
Load Tolerance (each step)±5%
Load Tolerance(overall)±3%
Display Precision0.5 class
Control Power220VAC/50Hz,
WeightAbout 23000kgs/set
Size12192*2438*2591mm

Product Advantages

Manual Load: input power and power factor, and load according to the preset value.

Automatic Load: set several load stages and duration, then complete the process according this stages automatically. 0%- 25%,- 50%,- 75%, -100%

Real-time Monitor: through software display main parameter value, such as voltage, current, power, power factor, frequency and time.


Application

Large generator system testing in ocean engineering, drilling facilities,ship construction etc field
Factory testing for generator, static voltage characteristic test, speed characteristic test;
Marine generator overload protection test,parallel operation test,reverse power and reverse current protection test
Assist shipyard in mooring test,sea trial test
Assist with the acceptance of the vessel generator test
Eliminate the carbon deposition of generato
r

China 10.5 KV Generator Load Bank Real Time Monitor For Sea Trial Test supplier

10.5 KV Generator Load Bank Real Time Monitor For Sea Trial Test

Inquiry Cart 0