Wirewound Technology Resistance AC Load Bank 1000KW For Data Center Testing

Brand Name:KAIXIANG
Certification:ISO9001
Model Number:1000KW
Minimum Order Quantity:ONE SET
Delivery Time:ONE MONTH AFTER GET DEPOSIT
Payment Terms:L/C, D/A, D/P, D/P, T/T, Western Union, MoneyGram, D/P
Contact Now

Add to Cart

Active Member
Location: Shijiazhuang Hebei China
Address: No33 Wangshan Road, Green Island Economic Development Zone, Shijiazhuang, China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

Wirewound Technology Resistance AC 1000KW Load Banks For Data Center Testing

Product Description

1. AC Load Bank offers the most robust, high-capacity designs in the industry.

2. It is setting the standard with intelligent operator controls, safety indication layouts, adjustable load step resolution, and lightweight designs.

3. AC Load Bank is the perfect solution for regularly scheduled maintenance testing and commissioning of mission-critical standby emergency power systems.


Technical Parameters


Rating Voltage/Frequency400VAC/50Hz, 3 phase 4 wire,
Rated Load PowerResistive load: 1000kW
Installed CapacityResistive load: 1000kW
Load Step1,2,2,5,10,20,20,50,100,200,200,200,200kW, min step load: 1kW
PF(Power Factor)1
Load Tolerance (each step)±5%
Load Tolerance(overall)±3%
Display Precision0.5 class
Control Power380VAC/50Hz, 3 phase 4 wire,
Wire Connection

Load power supply input——Copper bar (star coupling)
Control power supply input——Connector-bar

InsulationF
Duty CycleContinuous
Casing Dimensions and Coolingabout 1680*2400*1440mm (length*width*height) Forced air cooling,Horizontal inlet air,Horizontal outlet air
WeightAbout 1200kgs/set
TransportationHoisting, there are lifting lug in top of casing
Casing ColorGrey(RAL7035)
Ambient Temperature-10℃~+50℃
Relative Humidity≤95%
Altitude≤1500 meter
Atmospheric Pressure86~106kPa
ContactorSchneider
FuseDELIXI
MCUINFINEON
Data processing softwareKaixiang(self-developed)
Alloy ResistanceKaixiang(self-developed)


Product Advantage

1. User can press the emergency stop button in the panel to unload immediately when the load bank is abnormal while working.
2. Over-load: Automatic load dump and give alarm when voltage is over safety thresholds.
3. Short Circuit Protection: Fuse could avoids damage to equipment when short circuit or current overload.
4. Fan protection: Machine could not do load testing before working power of fan is on.
5. The machine will unload and give alarm when any fan is abnormal or with insufficient air volume, etc.

Application

About resistor alloy, we use nickel-chromium alloy(NiCr6023) which can withstand high temperature (Max operation temperature at 1,300℃), be of small temperature drift (5*10-5/℃) and steady electrical performance.


China Wirewound Technology Resistance AC Load Bank 1000KW For Data Center Testing supplier

Wirewound Technology Resistance AC Load Bank 1000KW For Data Center Testing

Inquiry Cart 0