1000KW AC Load Bank For Backup Power Supply Generator UPS
Transformer
Product Description
1. Automatic AC load bank main used to test the capability and
aging degree for high-power ups on-line, inverter, switch power and
diesel generator set for electric power, telecom department and
manufacturer.
2. It can ensure the reliability of constant power charge that
adopts uniformly stepped power input, energy consumption work model
and forced air-cooling model.
3. It is of high power density, no red hot phenomenon and automatic
protection function overheated.
Technical Parameters
Rating Voltage/Frequency | 400VAC/50Hz, 3 phase 4 wire, |
Rated Load Power | Resistive load: 1000kW |
Installed Capacity | Resistive load: 1000kW |
Load Step | 1,2,2,5,10,20,20,50,100,200,200,200,200kW, min step load: 1kW |
PF(Power Factor) | 1 |
Load Tolerance (each step) | ±5% |
Load Tolerance(overall) | ±3% |
Display Precision | 0.5 class |
Control Power | 380VAC/50Hz, 3 phase 4 wire, |
Wire Connection | Load power supply input——Copper bar (star coupling) |
Insulation | F |
Duty Cycle | Continuous |
Casing Dimensions and Cooling | about 1680*2400*1440mm (length*width*height) Forced air cooling,Horizontal inlet air,Horizontal outlet air |
Weight | About 1200kgs/set |
Transportation | Hoisting, there are lifting lug in top of casing |
Casing Color | Grey(RAL7035) |
Ambient Temperature | -10℃~+50℃ |
Relative Humidity | ≤95% |
Altitude | ≤1500 meter |
Atmospheric Pressure | 86~106kPa |
Contactor | Schneider |
Fuse | DELIXI |
MCU | INFINEON |
Data processing software | Kaixiang(self-developed) |
Alloy Resistance | Kaixiang(self-developed) |
Product Advantage
Control mode interlock: there is switch in control panel to choose
control mode, other control mode is invalid if user choose one
control mode.
With data processing software, could form curve of current, active
power, reactive power, apparent power, power factor, frequency and
can be printed.
One-key load/unload: user can load or unload with one key easy to
control.
Application
Manufacturers of standby power generators commonly use load banks
to test and tune newly assembled units. When the generator has been
set up in a test cell within the factory, a test engineer uses the
load bank to apply a discrete, selectable electrical load to the
generator and measure the response stability and endurance. During
this process, the test engineer calibrates and adjusts the
generator performance to ensure it meets the intended product
specifications and tolerances.