OEM Customized Stainless Steel Valve Body Precision Investment Castings

Brand Name:NC210
Certification:ISO9001,CE,SGS
Model Number:210
Minimum Order Quantity:100 pcs
Delivery Time:30 days
Payment Terms:T/T, L/C
Contact Now

Add to Cart

Site Member
Location: Ningbo Zhejiang China
Supplier`s last login times: within 48 hours
Product Details Company Profile
Product Details

OEM Customized Stainless Steel Valve Body Precision Investment Casting


Product Details


MaterialsStainless Steel
Producing ProcessSand casting, precision casting
Testing facilitiesAutomatic wax machine, Automatic Shell-making line, Medium-frequency induction furnace, Bogie-hearth resistance furnace, Vertical machining centre, Horizontal machining centrespectrograph, Universal tester, Rockwell apparatus, Brinell tester, Shock testing machine, Three-dimensional machine, Magnetic partical flaw detector
ToleranceCT 1--16
Surface TreatmentPainting, polishing, powder coating, zinc plating, chrome plating,heat treatment etc
DesignAs per the customer’s design, idea & samples; As per samples, we can provide surveying and drawing
ServiceOEM&ODM. Accept trial orders
PackingPlywood box, iron box, stretch-wrap and pallet
InspectionSelf-inspection:GB/T 2828.1-2003/ISO 2859-1:1999,UT, MT,RT, 3D,
Main export marketWestern Europe North America Eastern Asia
Mainly ProductsAutomotive,railway,mining machinery,agricultural machinery parts,pump valves,constructional machinery and medical machinery


Products We’ve Made


We divide our products into several categories. Gray Iron Casting, Ductile Iron Casting, Steel Casting, Stainless

Steel Casting for Scaffolding Accessories, Post Tension Anchorage, Automotive Part, Pump and Valve Body,

Pipe Fitting, Manhole Cover and Bollard, Ornamental Fence and Spear, Light Pole and Bench Casting, Railway Part.



Our Service


Professional design team and sales department for your service;
Factory recognized by 'CE/ISO9001' and so on;
7*24 service for you, all the question will be dealed within 24hours.

Advantages

1. Stable quality —— Coming from good materials and technic
2. Lower price —— Not cheapest but the lowest at the same quality
3. Good service —— Satisfactory service before and after sale
4. Delivery time —— 30-45 days for mass production


FAQ


How long is the new product development cycle?
The mold making period of new product is 30 days.

What's the time for new product sample making?
20 days.

How to ensure product quality?
Using the national table pig iron, the molten iron was detected by the rapid analyzer before the smelting time,

and the material was adjusted.

What’s the inspection equipment ?
There are fast analyzer before furnace, Jin Xiangyi, hardness tester, tensile testing machine,

product testing equipment is complete.

How long will the batch production take?

The new product can be produced in bulk within 25 days after the confirmation of the new product, and a container can be completed every month


China OEM Customized Stainless Steel Valve Body Precision Investment Castings supplier

OEM Customized Stainless Steel Valve Body Precision Investment Castings

Inquiry Cart 0