304 Hardware Parts Stainless Steel Automatic Machine Parts

Brand Name:NC0842
Certification:ISO9001,CE,SGS
Model Number:0842
Minimum Order Quantity:100 pcs
Delivery Time:30 days
Payment Terms:T/T, L/C
Contact Now

Add to Cart

Site Member
Location: Ningbo Zhejiang China
Supplier`s last login times: within 48 hours
Product Details Company Profile
Product Details

304 Hardware Parts Stainless Steel Automatic Machine Parts

Product Details

Processing
CNC turning, CNC milling, Drilling, Grinding, Spinning, Wire-EDM Cutting, Stamping, Laser Cutting, Bending, Die Casting, Extrusion, Injection Molding
Materials
Aluminum: 2000 series, 6000 series, 7075, 5052, etc.
Stainless steel: SUS303, SUS304, SS316, SS316L, 17-4PH, etc.
Steel: 1214L/1215/1045/4140/SCM440/40CrMo, etc.
Brass: 260, C360, H59, H60, H62, H63, H65, H68, H70, Bronze, Copper
Titanium: Grade F1-F5
Plastic: Acetal/POM/PA/Nylon/PC/PMMA/PVC/PU/Acrylic/ABS/PTFE/PEEK etc.
Surface Treatment
Anodized, Bead Blasted, Silk Screen, PVD Plating, Zinc/Nickel/Chrome/Titanium Plating, Brushing, Painting, Powder Coated,
Passivation, Electrophoresis, Electro Polishing, Knurl, Laser/Etch/Engrave etc.
Quality Assurance
ISO9001:2015, ISO13485:2016, SGS, RoHs, TUV
Tolerance
+/-0.002~+/-0.005mm
Surface Roughness
Min Ra 0.1~3.2

Production Process

304 Hardware Parts Stainless Steel Automatic Machine Parts

About Us

Sunrise Foundry is a professional Metal Foundry, located in Ningbo. We have been producing Gray Iron,

Ductile Iron Castings and and any other precision castings for more than 25 years.

We are dedicated to meet different requirements of various customers across the world, products are mainly

involved Agricultural and Construction Machinery, Hydraulic, Mining industry, Municipal Products, some steel

and stainless steel castings for Pumps and Valves, Pipe Fittings, etc.

Please feel free to contact us if you have any requests.

Quality Control

304 Hardware Parts Stainless Steel Automatic Machine Parts

FAQ

1: What information does the quotation need?
Pls. offer your drawings and/or samples, quantity and packing’s requirements.
Drawings in PDF, IGS, DWG, STEP, MAX are suitable to us.

2: What’s lead time for samples and products?
Lead time for samples: 30-70days depend on the structure of the part and other requirements on heat treatment, machining, surface
treatment and so on.
Mass production lead time: 35-70days depend on products’ characteristics and quantity.

3: What is the requirement on payment?
Tooling Cost:100% T/T advanced
Payment for the Order:50% deposit,50% to be paid before shipment.

4: What are surface treatments available?
Powder coating, Shoot Blasting, Painting, Polishing, Acid Pickling, Anodizing, Zinc Plating, Hot-dip Galvanizing, Electrophoresis,
Chrome Plating

China 304 Hardware Parts Stainless Steel Automatic Machine Parts supplier

304 Hardware Parts Stainless Steel Automatic Machine Parts

Inquiry Cart 0