

Add to Cart
0.1-10mm Thick Sheet Metal Products Deep Drawing Stamping Products
Shipping
1. FedEx/DHL/UPS/TNT for samples, Door-to-Door;
2. By Air or by Sea for batch goods, for FCL; Airport/ Port
receiving;
3. Customers specifying freight forwarders or negotiable shipping
methods!
Delivery Time: 5-15 days for samples; 35-40 days for batch goods.
Payment Terms
Payment: T/T, MoneyGram,PayPal; 30% deposits; 70% balance before
delivery.
Our Products and service
Xicheng company can produce lots of punching parts/stamping parts
for motor, ship, train, construction, furniture, machine, pipe
system...
1).We remain profitable and sustainable even through the current
economic downturn, in part though our market diversification,
and in part due to our conservative philosophy guiding the way we
have done managed our business since 2007.
2).We continue to offer innovative cost reduction options at the design stage and value added value engineered cost savings for our customer's current products.
3).We listen to our Customers and add systems,processes,equipment or facilities,constantly to meet the needs and requests of our customers.
4)While these key indicators are a "Given" today, we track, monitor and implement changes to always improve our goals as we strive to improve in everything we do.
5)Our commitment to quality is backed up by third party certification to world class quality standard ISO. We offer the global OEM market quality distinction in manufacturing,innovative & engineering.
FAQ
Q1:What is your company's advantage?
Manufacturing factory directly.
Complete production department,we have metal stamping department
with tooling design and manufacturing department,etc.
Professional engineers team to figure out the best production
progresses for customers' projects. And aslo can make the design
according to customers' idea .
With complete production department,we can make complete metal
parts for customers‘ project to save the cost and ensure the
quality at the same time.
Complete QC line for production with ISO and CE standard for
production department.
Assembly metal parts and plastic parts for customers' project to
save the time for custmers‘ projects.
Q2:How do your company control the products' quality?
Well, as we all know that the quality comes first during the
businesses with our customers that we always persist in “Quality is
the life of enterprise.we are using the first confirmed cases,
production inspection, packaging seized the entire combination to
control products quality strictly.
Q3:Are you a manufacture company or trade company?
We are a professional hardware manufacture company with over 15
years history,we have our own factory with complete hardware
produce equipments and professional engineers that we can produce
out perfectly products according to your requirements.
Q4:How about your products' price?
Well, we are insisting on the "win-win" principle.With the most
advantageous price,to help our clients to gain more market share,
so as to win more business.
Q5: How to order?
(1)You send us drawing or sample;(2)We carry through project
assessment;(3)We make the sample and send it to you;(4)You think
the sample is good then place an order and pay us 30% deposit;(5)We
start to make the product;(6)When the goods is done, we deliver it
to SHANGHAI port;(7)You pay us the balance after you see the B/L
Copy;(8)The whole order is done,thank you!
Q6:How to contact us?
More infomation please contact us:
Celia-yin@qcmetal.com, Cathy_Wang@xcmetal.com
Wechat/Whatsapp: +86 13564766932, +86 18297566452
www.qcmetal.com
www.standardaccesspanel.com
Product photos