50ML Medical Centrifuge Tube Mould Core Pins Assembly FS139M

Brand Name:SENLAN
Certification:ISO9001
Minimum Order Quantity:1pcs
Delivery Time:5-20working days
Payment Terms:D/P, L/C, D/P, T/T
Place of Origin:China
Contact Now

Add to Cart

Verified Supplier
Location: Dongguan Guangdong China
Address: NO.27,ShangLang Road,XiaBian District,Chang'an town, Dongguan China
Supplier`s last login times: within 27 hours
Product Details Company Profile
Product Details

50ML Medical Centrifuge Tube Mould Parts Assembly Mould Parts Core Parts


We are a professional medical tube and core pins mold parts manufacturer and supplier in China, specializing in providing customized services. The tolerance we can do is 0.003mm, if you need it, welcome to send a quotation


Medical Tubes/core pins Mold Parts Product Description:

Part Name: Plastic Medical Parts

Product description: Plastic Injection Mould/Plastic Medical Parts Mould

Place of Origin: Dongguan, China

Current export market: Europe

Delivery time: 15-30 days

Main Specifications:

1. Packaging mold accessories

2. Medical parts mold

3. Die casting mold accessories


Specification Of Tube/core pins Mold Parts:


Material

ASP23, SKD11, SKD61, HSS, M2, D2, SUJ2, S45C ect

Standard

DIN, MISUMI, EDM, MOELLER, HASCO ect

Size

Depend on your drawings or products standard

Place of origin

Dongguan, Guangdong, China

Heat Treatment

Available

Surface Work

TiCN, TiN, Aitain, Ticrn, Nitriding, Black Coating etc available

Tolerance

+/- 0.002mm

Polishness

Close to Ra0.2

Hardness

Depends on material (HRC45~64)

Delivery Time

3-5 Working days, depends on the quantity the order. Express by DHL, UPS, FEDEX, TNT or Ocean Shipping etc.


Purchase Core Pins Process Chart:


Plastic Mold (Moulds) Components

Production Process

Description

1. 3d Design/Samples For Quotation

According to 3D drawing or samples for quotation

2. Negotiations

Including the price of mold components

for cores & cavities, weight of product, payment, lifetime, delivery, etc.

3. Purchasing Order

After the customer confirming the mould design and quotation

4. Making mold(moulds) components

Confirm drawing, start to do DFM, mold flows and mold detail agreed

with the customer, start production

5. Production schedule

Every week we will feedback to the customer a mold progress (picture)

6. Sample Shoot

We provide the moulds Components test samples for confirmation (about 1-2piece), then,

get your signature sample, mass production

7. Package

Cartons box for parts, or as your requiretment

8. Delivery

Deliver goods by air or by sea. Express


FAQ:


Q1: How Long We Will Get The Goods?
A: Generally it is 2-5 days if the goods are in stock. or it is 16-23 days if the goods are not in stock, it is according to quantity and your customization need


Q2: Do You Have Any Office In My Country ?
A: We have no office in other countries now, but with 15 years development, we have been one of the leading manufacturer for plastic mold parts in dongguan city, which has exported the goods to nearly 35 countries, each components was tested through the strict quality control system before delivery, and we never get any complaint from clients yet


Q3: Could You Provide Us Report When We Need?
A: Yes, we can provide material report, dimensional report and heat treatment report, as well as the special report you require from the third party inspection company


Q4: Could You Accept D/A Payment?
A: At the moment, we accept TT, L/C At sight, Paypal


China 50ML Medical Centrifuge Tube Mould Core Pins Assembly FS139M supplier

50ML Medical Centrifuge Tube Mould Core Pins Assembly FS139M

Inquiry Cart 0