Product Details
Economical design big wind load steel warehouse in Mauritius
/
Main Parts | Item Name | Specification |
Main Steel Frame | Column | Q235B, Q345B H shape, Box, Steel pipe, Hot rolled steel |
Beam | Q235B, Q345B H-beam |
Finish | Shot blasting Sa 2.5, Zinc Rich Epoxy primer finish 100um |
Supporting System | Brace | Q235B, Q345B , Steel rod, Steel pipe, Angle steel. Galvanization 275g/m2 |
Roof Purlin | C or Z shape, Steel purlin |
Wall Purlin | Q235B, Q346B C or Z shape, Steel purlin |
Roof | 0.45/0.5/0.6mm corrugate steel sheet (Aluminum & Zinc coated AZ100g/m2+surface painting 20/5um) 50/75/100mm EPS, Rock wool, PU, Glass wool sandwich panel |
Wall | 0.45/0.5/0.6mm corrugate steel sheet (Aluminum & Zinc coated AZ100g/m2+surface painting 20/5um) 50/75/100mm EPS, Rock wool, PU, Glass wool sandwich panel |
Accessories | Bolts | Ordinary, High strength |
Gutter | Galvanized Steel, Stainless steel |
1. Common type of the industrial building? Reply: Portal frame is the usual type in the industrial workshop
and warehouse shed. Other types also could be designed and manufacturer as per clients’
request. |
2. What’s the quality grade of the steel structure components? Reply: Q345 is used for main steel structure, Q235 is used for
secondary steel structure. |
3. How about the delivery time? Reply: Usually,within 45-60 days after the order confirmed, also
depends on the fabrication quantity. |
4. How about the derust grade? Reply: Ball blasting Sa 2.5 on main steel structure ; manual derust St2.0 on secondary steel structure. |
5. What kind panel used for the roof and wall? Reply: Color corrugated steel sheet and sandwich panel could be
used. Sandwich panel performs well on the heat insulation,sound insulation.Common
sandwich materials are EPS, glass wool and PU. |
6. How to install it? Reply: We will furnish you the detailed construction drawing and
the construction manual which could help you to erect and install the building step by
step. We also could send the engineer to your local to help you if needed. |
7. Maintenance: Reply: Finish paint need be done after the frame installed, and do
it again after 6-8 months. So the surface will stay more time. |
Company Profile
Qingdao KaFa Fabrication Co., Ltd. is a professional steel
structure company who could provide you one-stop solution of the
steel structure projects . We specialize in Design,
Manufacture,Delivery and Installation of the steel structure
building. The floor space is 23,000㎡, and the workshop area is
12,000㎡. We own the light/heavy H steel production line, BOX
production line, C/Z purlin production line and various types of
profiling steel sheet machines. Our products have been exported to
Australia, South America, Southeast Asia, Middle East and Africa.
We are proud of helping our customers to build their dream to
reality.