

Add to Cart
06B121111K Engine Cooling System Parts Transit Thermostat Housing Engine Thermostat Assembly For Audi A4 A6
Product Name | Engine Thermostat Assembly |
Color | Sliver/Black |
Standard | ISO/BS/JIS/GSG/ROSH |
OE Number | 06B121111K |
Car make | For Audi A4 A6 |
Engine Model | BGB ALZ |
Material | Aliuminum/Metal/Rubber |
Leading time | 10 days |
Quality guarantee | 1 year |
Packing Size | 160*160*140 mm³ carton |
Net Weight | 0.41 kgs |
Gross Weight | 0.52 kgs |
The thermostat on your vehicle controls the flow of coolant based on temperature. When you just start your engine, the thermostat remains closed to accelerate the warm up process. After a few minutes, it opens up to allow the warm fluid to flow. If your vehicle is overheating but not blowing warm air from the heater, the problem is more than likely your thermostat.
If the thermostat gets stuck closed, it allows no fluid to flow and ends up overheating the coolant already in the engine. To fix this problem and get your vehicle's heat restored, replace your thermostat.
During your thermostat change, fluid loss is inevitable. Be sure to browse the website to get the proper replacement for your vehicle sent directly to your door.
Complete assembly with plastic housing & sensor.
We are designed to be a performance replacement for all Au-di spare parts. Our products featuring high-durometer material and high-tech treatments, We are engineered to limit unwanted wear and tear in the suspension system/engine system/air conditioner system/brake system, resulting in tighter handing and more comfortable ride experience than even original parts can offer.
1. About Sample
Sample is available, and the client just pay for the sample and
courier cost.
2. About MOQ?
(1) No MOQ request if stock items, like only 1pcs is acceptable.
(2) It needs to negotiate if no stock
3. About Quality
(1) 100% tested before delivery.
(2) 2 Years for Warranty
4. About Payment
(1) T/T, Western Union, Paypal
(2) 30% deposit and pay Balance before delivery
5. About Delivery Time
(1) 3-7 days for stock items;
(2) 10-40 days for mass production
6. About Packaging
(1) Brand Packaging
(2) Customized Packaging
(3) Neutral Packaging
Contact US