Starter Armature Testing Equipment Spins Rotor During Double Station WIND-ATS-02

Brand Name:WIND AUTOMATION
Model Number:WIND-ATS-02
Minimum Order Quantity:1pc
Delivery Time:35 working days
Payment Terms:T/T
Place of Origin:China
Contact Now

Add to Cart

Verified Supplier
Location: Shanghai Shanghai China
Address: No.4 Building , No.388, Kongjiang Road,Yangpu District,200093,Shanghai,China
Supplier`s last login times: within 36 hours
Product Details Company Profile
Product Details

Starter Armature Testing Machine Belt Spins The Rotor During The Test WIND-ATS-02


Application:


Starter armature upto 36 slots


covering 13, 17, 19 (few), 21,23,25,27, 28,29,33 slots (common)


Advantages:


1. Moden concept initial positioning, comparing to tranditional starter armature tester,


the operator no need to check initial positioning manually,


Make the testing convenient and easier.


2. 100% Satisfied feedback from starter armature manufacturers.


Question and Answer:


About you testing machine, could you explain me better about that belt which spins the


armature during the test? Why need to spin, is it better than the common ones?


You asked a good question about the belt for spin, Yes, it is better than the common ones,


The armature tester WIND-ATS-02 belt spin is for automatical positioning the armature slot,
as you may see some universal armatures have obvious slots for positioning while starter armature
don't have obvious slot groove for positioning,
If without the automatical positioning, the operator need to position armature on purpose every time he
load on the armature.

Technical Data:


Test ItemsTest DescriptionTest result
Bar to Bar resistance0.01mΩ~10mΩ≤±0.5% Full scale
Welding resistance0.01mΩ-10mΩ±10μΩ
180℃ cross resistance0.01mΩ-10mΩ≤±1.5% Full scale
Surge100-1000Vpp (Max 36sets waveform)±5%
Isolation resistanceDC 500V

0.1-500MΩ

≤±5% Full scale

HipotAC 100-1000V

0-20mA

≤±.5% Full scale


1. Bar to Bar resistance,0.01mΩ~10mΩ (Out of range display OVER)


Four-terminal measurement to ensure accuracy


2. Welding resistance,0.001mΩ-10mΩ (Out of range display OVER)


Six-terminal measurement to ensure accuracy


3. Cross resistance 0.01mΩ-10mΩ


Four-terminal measurement to ensure accuracy


4. Surge 100-1000V (100V/time)


Pulse crest:0.5u sec, Frequency 1~40MHz


Standard waveform is Write, OK waveform is Green, NG waveform is Red


5. Isolation resistance DC 500V


Testing time:1~10s (0.1s/time)


Range:1~500MΩ


Accuracy: ≤±5%


6. Hipot AC 100-1000V


Testing time:1~10s (0.1s/time)


Armature commutator bars ≤ 36 bars


Testing panel cycle time: 8~9s (according to 33bars)


13, 17, 19 (few), 21,23,25,27, 28,29,33 slots (common)


Main Configuration:


15’’ Touch screen Sampling Chip: BB Relay:NAIS High voltage relay:Meder


Pneumatic parts:Airtec


Power: AC 220V,50Hz


Air pressure:0.4~0.6MPa


Temperature:0~45℃


Dimension: 950mm*1250mm*580mm


HS Code:9030390000



China Starter Armature Testing Equipment Spins Rotor During Double Station WIND-ATS-02 supplier

Starter Armature Testing Equipment Spins Rotor During Double Station WIND-ATS-02

Inquiry Cart 0