Heavy Load Pallet Rack Shelving / Selective Pallet Racking 4000 mm Length

Brand Name:HUADE
Certification:R-mark from RMI / ISO
Model Number:HD-PR-5
Minimum Order Quantity:Negotiation
Delivery Time:around 3-4 weeks upon receipt signed & stamped PO and deposit
Payment Terms:T/T
Contact Now

Add to Cart

Site Member
Location: Nanjing Jiangsu China
Address: No. 111, Hou Jiao Road, Science Park, Jiangning District, Nanjing, China 211122
Supplier`s last login times: within 47 hours
Product Details Company Profile
Product Details

Heavy Load Pallet Rack Shelving / Selective Pallet Racking 4000 mm Length​


Description:


1. Goods stored on the selective storage racking can be loaded in first and loaded out first (FIFO), compared with the goods that can be stored in first but offloaded out last (FILO). Some seasonal goods, consumables should be put in first and taken out first.


2. Storage capacity of the selective storage racking system is influenced by the forklifts or material handling equipments. For counter-balanced forklifts, the aisle width should be wider to allow the forklifts to operated


Forklift application for selective storage racking:


Counter balanced forklift:

Racking aisle required: 4 ~ 4.5 meters

Storage space utilization: 30% ~ 35%


Reach fork truck

Racking aisle needed: 3 ~ 3.5 meters

Storage space utilization: 40% ~ 45%


Selective storage racking:


Huade produces most versatile automated storage systems and racking systems
For large projects with certain quantities, we will provide the unique design to get the most stable, reliable storage systems with minimum costs.
We provide the products without sacrificing the quality by cheating on workmanship and material.


Frequently Asked Questions

1. Q: Where is your factory located? How can I visit there?
A: Our factory is located in Nanjing of China, No.111, Hou Jiao Road, Science Park, Jiangning District, Nanjing, China 211122.
We sincerely welcome you to visit our factory!

2. Q: What is the raw material of your products?
A: Q235B, other material is also available based on the requirements.


3. Q: What is the term of payment?
A: 30% depoisit by T/T and balance upon receipt the copy of BL.

4. Q: What is delivery time?
A: Simple and standard products: within 20 or 25 days upon receipt the deposit. Complicated and Automated storage systems: within 40 to 50 days upon receipt the deposit.

5. Q: Which port will be used as loading port?
A: We are closed to Nanjing port. All the products will be shipped by the feeder vessal from Nanjing port to Shanghai port to catch the mother vessel there. If you need the goods to be shipped quickly, we are able to send the goods by trailer on road to Shanghai.

China Heavy Load Pallet Rack Shelving / Selective Pallet Racking 4000 mm Length supplier

Heavy Load Pallet Rack Shelving / Selective Pallet Racking 4000 mm Length

Inquiry Cart 0