Power Plant CFB Boiler Economizer Silver Boiler Spare Part For Petroleum Industry

Brand Name:ORL Power
Certification:ISO9001/SGS/TUV/ASME/EN
Model Number:Customization
Minimum Order Quantity:1 Set/Sets 10tons
Delivery Time:50~100 Days
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Active Member
Supplier`s last login times: within 28 hours
Product Details Company Profile
Product Details

Power Plant CFB Boiler Silver Boiler Spare Part Boiler Petroleum Industry Heat Boiler Economizer TUV


Production Descriptions

Boiler Economizer is the Energy improving device that helps to reduce the cost of operation by saving the fuel. The economizer in Boiler tends to make the system more energy efficient. In boilers, economizers are generally designed to exchange heat with the fluid, generally water. The exhaust from the boilers is generally in the temperature range of 200°C – 250°C, so there are a huge amount of losses from the boiler if any heat recovery devices are not installed after it. Boiler Economizer that suit your boiler system and will increase its overall efficiency from 3% – 5%. Increase in boiler efficiency will save a lot of your operating cost and eventually will prolong the life of your boiler system.

Classification

We can manufacture three types of boiler economizer, bare tube economizer, H finned tube economizer and spiral finned tube economizer. H-finned tube economizer is high efficient heat exchanger economizer which is consisted of H-finned tubes.
Compared with bare tube economizer, H-finned tube economizer can enlarge the heat exchange area and reduce the number of tubes. It also can increase the flue gas flow area in order to reduce the flue gas flow speed and abrasion.
H-finned tube can be made as double H finned tubes , with high rigidness to fit long tube row.
The spiral finned economizer is a newly designed heat transfer equipment, consists of spiral fin tubes to overcome the serious abrasion and short service time.

Specifications

DescriptionBoiler economizer
MaterialAlloy steel(SA213T22), Carbon steel(SA210C ) etc.
Material standardASTM, EN or ISO etc.
DimensionCustomization
WeightMin: 10 ton Max.:200 ton
Manufacturing processMaterial→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →Bending tube→Assembly →Inspection →RT→Heat treatment (annealing)→Hydraulic pressure test→Painting→ Packaging

CFB Boiler Economizer


Name&TypeSupply Ability:FOB Price
Boiler drum100Ton/Tons per MonthContact Me Get Latest Price
Boiler header100Ton/Tons per MonthContact Me Get Latest Price
Boiler waterwall panel500Ton/Tons per MonthContact Me Get Latest Price
Boiler economizer500Ton/Tons per MonthContact Me Get Latest Price
Boiler super heater300Ton/Tons per MonthContact Me Get Latest Price
Boiler air preheater300Ton/Tons per MonthContact Me Get Latest Price
Other300Ton/Tons per MonthContact Me Get Latest Price

Company Information


Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province.

ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin economizer, spiral fin tube, air preheater, heat pipe, flue etc.), seamless steel tubes/pipes and ERW steel pipes.ORL provides our customer with full range of services including boiler design, fabrication, installation and commissioning, boiler maintenance, and supervision at site. Our product and service include design and manufacture industrial boilers, pressure vessels and tanks, and pressure parts for power plant boilers (600MW, or 1000MW).

Main Products

Production Workshop

Production Test

Packing&Shipping


Certifications

We have our boiler manufacturing plant, and obtain ISO9001:2008, ISO3834, ASME S, U and GB stamp.

Commerce Terms:

Minimum Order Quantity:1 Piece
Price:US $10000 - 50000 / Set | Contact Me Get Latest Price
Packaging Details:Iron Frame Package
Delivery Time:50~100 Days
Payment Terms:Payment by T/T, Payment percentage can be negotiated according to actual situation.The balance against the receipt of the correct test certificates or as per customer’s suggestion.
Supply Ability:

300Ton/Tons per Month

Company Business

Trading Process


FAQ:

Q1: Which port is closest to your location?

A: Qingdao Port is closest to our factory, about 1 hour driving distance to our place.


Q2: How about your delivery time?

A: Generally, it will take 30-45 day after receiving your advance payemnt. The specific delivery time depends on the items and the quantity of your order.


Q3: Do you offer overseas installation service?

A: Yes, we can send engineers or welders to help installation at site.

Contact Information

ADD: No.11, East Renmin Road, Zhangjiagang City, Jiangsu, China

Phone:+86 0512-56770166

E-mail: info@orlpower.com

Website: http://www.orlpower.com

China Power Plant CFB Boiler Economizer Silver Boiler Spare Part For Petroleum Industry supplier

Power Plant CFB Boiler Economizer Silver Boiler Spare Part For Petroleum Industry

Inquiry Cart 0