200 Ton Water Tube Boiler Economizer In Thermal Power Plant ASTM EN

Brand Name:ORL Power
Certification:ISO9001/SGS/TUV/ASME/EN
Model Number:Customization
Minimum Order Quantity:1 Set/Sets 10tons
Delivery Time:50~100 Days
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Active Member
Supplier`s last login times: within 28 hours
Product Details Company Profile
Product Details

200 Ton Water Tube Boiler Economizer In Thermal Power Plant ASTM EN


Boiler Parts


Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Cyclone Separator,Boiler Chimney Flue Pipe,Boiler Air Preheater,Boiler Air Preheater


Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube


Specifications

Description

Boiler economizer

Material

Alloy steel(SA213T22), Carbon steel(SA210C ) etc.

Material standard

ASTM, EN or ISO etc.

Dimension

Customization

Weight

Min: 10 ton Max.:200 ton

Manufacturing process

Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →Bending tube→Assembly →Inspection →RT→Heat treatment (annealing)→Hydraulic pressure test→Painting→ Packaging


Name&TypeSupply Ability:FOB Price
Boiler drum100Ton/Tons per MonthContact Me Get Latest Price
Boiler header100Ton/Tons per MonthContact Me Get Latest Price
Boiler waterwall panel500Ton/Tons per MonthContact Me Get Latest Price
Boiler economizer500Ton/Tons per MonthContact Me Get Latest Price
Boiler super heater300Ton/Tons per MonthContact Me Get Latest Price
Boiler air preheater300Ton/Tons per MonthContact Me Get Latest Price
Other300Ton/Tons per MonthContact Me Get Latest Price

Production Descriptions

Boiler Economizer is the Energy improving device that helps to reduce the cost of operation by saving the fuel. The economizer in Boiler tends to make the system more energy efficient. In boilers, economizers are generally designed to exchange heat with the fluid, generally water.

The exhaust from the boilers is generally in the temperature range of 200°C – 250°C, so there are a huge amount of losses from the boiler if any heat recovery devices are not installed after it. Boiler Economizer that suit your boiler system and will increase its overall efficiency from 3% – 5%.

Increase in boiler efficiency will save a lot of your operating cost and eventually will prolong the life of your boiler system.


Classification

We can manufacture three types of boiler economizer, bare tube economizer, H finned tube economizer and spiral finned tube economizer. H-finned tube economizer is high efficient heat exchanger economizer which is consisted of H-finned tubes.


Compared with bare tube economizer, H-finned tube economizer can enlarge the heat exchange area and reduce the number of tubes. It also can increase the flue gas flow area in order to reduce the flue gas flow speed and abrasion.


H-finned tube can be made as double H finned tubes , with high rigidness to fit long tube row.


The spiral finned economizer is a newly designed heat transfer equipment, consists of spiral fin tubes to overcome the serious abrasion and short service time.



Product Description


Production Workshop

Boiler Product Test


Impact test,The scene to examine the water-wall,Industrial TV monitoring,Snake-like pipe water pressure test,Header endoscopic detection,Header weld inspection

Testing Center



Our products have been wildly used in power plants and large international companies overseas.


Such as USA, Brazil, Porto Rico, Guatemala, Spain, Demark, Norway, Turkey, India, Korea, Australia, Middle East, Southeast Asia etc.


Trading Process



ORL offers prompt response, professional products, and all-around service to our customers. Our experienced sales team and engineers are waiting for your enquiry and ready to provide sincere service. We cordially welcome domestic and overseas friends to visit our company and manufacturing bases, and look forward to building up long-term, mutual cooperative relationship with you.


FAQ


1. How to order?
Welcome come to our factory for inspecting and discussion the technical details.

2. Why choose us?

We are boiler and boiler parts(boiler drum, boiler waterwall panel, boiler economizer, boiler header, boiler cyclone separator, boiler flue pipe, boiler air preheater, boiler pipe, boiler tube)manufacture and we are one of the best suppliers in China.


We ensure the deliver time, high quality, and the best after-sale service for you.

China 200 Ton Water Tube Boiler Economizer In Thermal Power Plant ASTM EN supplier

200 Ton Water Tube Boiler Economizer In Thermal Power Plant ASTM EN

Inquiry Cart 0