plastic parts, plastic injection moulding, mold, auto part, over moulding

Brand Name:Forwa
Certification:ISO9001:2008 ISO14001
Minimum Order Quantity:1 set
Payment Terms:T/T
Place of Origin:China
Supply Ability:500 set per year
Contact Now

Add to Cart

Active Member
Location: Dongguan Guangdong China
Address: Haibin Industrial Zone,Shangsha , Chang'an Town, Dongguan city, China.
Supplier`s last login times: within 42 hours
Product Details Company Profile
Product Details

Description:

The Part Name: Orange Starter
Mold type: Plastic injection mold with cold runner.
Part Material: POM
Locating Ring Dimension: φ100
KO Pattern: 200*200mm
Sprue Radius: SR10.5
Ejection Type: Ejection pins, ejection sleeves.
Mold Construction Description: Cold runner with sub gate, 2 plate mold with sliders, lifters, inserts, and shut off area.

Quick Detail:

1. Part Name: Orange Starter
2. Plastic Material: POM
3. Cavity Material: 1.2344 HRC48-52
4. Mold Life: 1000K shots or according to customers quantity condition to make it, then will save the cost for our customer.
5. Gate Type: Point Gate, Sub Gate, Side Gate, Valve Gate, Edge Gate, Tip Gate etc, the gate will according to the part structure and customer’s requirement.
6. Mold Base Standard: HASCO, DME, LKM local standard, and will according to customer’s requirements.
7. Standard of Mold Accessories: LKM, DME, HASCO, MISUMI, MEUSBURGER.
8. Hot Runner: YUDO, MOLDMASTER, HUSKY, INCORE, HRS, PETS etc, and will according to customer’s requirements.
9. Hydraulic Cylinder: MERKER or Chinese local brand etc, and will according to customer’s requirements.
10. Design Software: UG, CAD, Moldflow etc.
11. Machine: From 30T to 250T, total 25 sets machine.
12. Payment: T/T, to be negotiated.
13. Packaging: Wooden case with steel frame.
14. Mold Logo: Based on customer’s requirements.
15. After Sales Service: One year warranty.

If the mold choose the hot runner, the mold key advantages showed below:
1. Clamping pressure can be lower
2. Cooling time is faster
3. Cycle time is faster
4. Energy consumption lowered
5. Injection pressure can be lower
6. Injection process is cleaner
7. Injection gate are on better locations
8. Labor costs for removing the part from the mold and separating runner scrap from the part are eliminated.
9. Output increased
10. Overall profitability increased
11. Possibility of contamination is lessened with no runners
12. Possibility of producing the parts using small injection machines
13. Problems on nozzle freeze or sprue sticking are eliminated
14. Production costs are lowered
15. Production steps are shortened
16.quality of the plastic part is better
17. Regrinding is eliminated
18. Resin costs are lowered
19. Runner scrap eliminated or reduced
20. Runner weight reduces shot size

Specifications:

NameWhith Motorhalter (Plastic Injection Mold)
Plastic MaterialABS, PP, PA66, PA6, PPA, PE, TPV, TPU, LDPE, POM,PA+GF, PET, PMMA, PC+ABS, POM+GF, etc.
Mold Base MaterialSKD11, 1.2312, 1.1730, 1.2311, P20, etc.
Cayity & Core MaterialH13 HRC48-52, 1.2343, 1.2344, S136, 1.2083, 1.2767, NAK80, etc.
Mold Life1000K shots or according to customers quantity condition to make it, then will save the cost for our customer.
Cavity Number1 cavity, 2 cavities, 4 cavities, it is according to customer’s requirements.
RunnerCold runner or Hot runner.
Gate TypePoint Gate, Sub Gate, Side Gate, Valve Gate, Edge Gate, Tip Gate etc, the gate will according to the part structure and customer’s requirement.
Mold Weight2000KG
Mold Base StandardHASCO, DME, LKM local standard, and will according to customer’s requirements.
Cycle Time35 Seconds
Standard of Mold AccessoryLKM, DME, HASCO, MISUMI, MEUSBURGER.
Design SoftUG, CAD, Moldflow etc.
File FormatsUG, CAD, Moldflow etc.
Injection Molding MachineFrom 30T to 250T, total 25 sets machine.
MOQ1 set
PaymentT/T, to be negotiated.
PackagingWooden case with steel frame.
Delivery Time(day)35 days T1, according to customer’s requirements.
OEM or ODMIs available
Mould LogoBased on customer requirements.
After Sales ServiceOne year warranty.


How to pack the mould:

1. Check the mould component
2. Cleaning mould cavity / core and spread slushing oil on the mould
3. Cleaning mould surface and spread slushing oil on the mould surface
4. Put into the wooden case











China plastic parts, plastic injection moulding, mold, auto part, over moulding supplier

plastic parts, plastic injection moulding, mold, auto part, over moulding

Inquiry Cart 0