3000L / 5000L / 10000L Dairy Processing Plant For Milk Manufacturing Process

Brand Name:Shanghai Beyond
Certification:ISO9001/CE/SGS
Model Number:BY-DU
Minimum Order Quantity:1set
Delivery Time:60-100 working days upon receipt of payment and confirmed the drawings
Place of Origin:China
Contact Now

Add to Cart

Verified Supplier
Location: Shanghai Shanghai China
Address: No.680 Tingyi Road, Tinglin Industrial Park, Jinshan District, Shanghai, 201505, China
Supplier`s last login times: within 23 hours
Product Details Company Profile
Product Details

Complete Set of Industrial Type Milk Processing Line for Various Kinds of Milk Products


Description:

Shanghai beyond machinery co., ltd is specialized in supplying various kinds of milk processing line, including the pasteurized milk, UHT milk, flavored milk, yoghurt, cheese and butter, cream, condensed milk etc.

Shanghai Beyond can supply complete turnkey projects for customers, integrating with designing, equipment manufacturing, to installation and commissioning and also training the operators.

Pasteurized milk process: milk transporting, milk filtering and collection; cooling and storaging, cream separation, pasteurization, homogenization, degassing, and filling.


Technical parameters


Raw materialliquid cow milk, goat milk, camel milk, milk powder dissolving with water
ProductPasteurized milk, UHT milk, yogurt, flavored milk, milk drink, sour milk , butter, cheese and so on.
Capacitydaily production : 3000L/5000L/10000L/20,000L
Product packageAseptic pouch, Gable Top box, plastic bottle, plastic cup, glass bottle,plastic pouch, Bulk,according to customer’s requirement
Service includeTurnkey project service: design,manufacture,installation,commissioning,training, after-sale service and son on

*Duration of Guarantee:

1. within 12 months since the installation and commissioning of equipment are finished, If the defects of equipment and spare parts result from the seller, the seller will supply spare parts and maintenance by free of charge. If the defects result from the buyer’s improper use of equipment, seller will charge the cost of maintenance and spare parts.

2. After 12 months since the installation finished, if the equipment and spare parts are defected, the seller will charge the cost of maintenance and spare parts.

3. If Buyer request Seller and engineer to Buyer's factory, buyer should supply seller’s workers the round trip air tickets and subsidary for each worker per day. And the local traffic, accommodation and lodging fees should also be available.


*installation terms:

1. 50-60 days for installation and commissioning.

2. BEYOND CO., provide installation, commissioning of all equipment supplied by BEYOND CO., as stated in the quotations.

3. buyer provide round way air tickets,local traffic , room and board,in addition pay subsidary per day for each engineer.


China 3000L / 5000L / 10000L Dairy Processing Plant For Milk Manufacturing Process supplier

3000L / 5000L / 10000L Dairy Processing Plant For Milk Manufacturing Process

Inquiry Cart 0