SUS316 Fresh Milk Processing Equipment Dairy Beverage Processing Line

Brand Name:Shanghai Beyond
Certification:ISO9001/CE/SGS
Model Number:BY-DU
Minimum Order Quantity:1set
Delivery Time:60-100 working days upon receipt of payment and confirmed the drawings
Place of Origin:China
Contact Now

Add to Cart

Verified Supplier
Location: Shanghai Shanghai China
Address: No.680 Tingyi Road, Tinglin Industrial Park, Jinshan District, Shanghai, 201505, China
Supplier`s last login times: within 23 hours
Product Details Company Profile
Product Details

Fresh Milk Processing Equipment/Dairy and Beverage Processing Line

Description:

Automatic production line
Provide installation and commissioning services
Capacity from 500 litres to 20000 litres per hour
Bottles, sachets (bags), cartons and cups are packaged for customers to choose from.
Because the product can be stored for a long time without deterioration and does not need refrigeration, it has many advantages for manufacturers, retailers and consumers. This includes expensive products such as cream, desserts and sauces.
Equipment introduction:
The production line is used to produce pasteurized milk, yogurt, lactic acid bacteria beverage and milk beverage. Complete production line, including milk collection system / power reduction system, water treatment system, sugar melting and mixing system, filtration, degassing, homogenization and sterilization, heat preservation, fermentation, CIP cleaning, filling, coding and packaging.
Optional configuration
Raw materials: milk / goat milk / yak milk / milk powder


Features and advantages:

1. Processing capacity can be ranged from 2T/Day to 1000T/Day.

2. High standard design, manufacture and project installation requirements, which guarantee the first-class finish products in the dairy processing line.

3. PLC control the whole production line, saving labor force and facilitate production management.


Specifications:

Brand Name:Shanghai Beyond
Model Number:BY-FM
Capacity5-300TPD
Raw material

Fresh cow milk, buffalo milk, goat milk, camel milk

or milk powder, or both mixed

End productStrawberry milk, banana milk, apple flavor milk, chocolate milk, grape milk, mango milk
Shelf life

35-40days, 3months, 6months, 12months

(keep at room temperature )

Fresh milk inlet temperature4 ℃ or 30℃
Filling temperature20~30 ℃
Package for end productPET bottle, plastic container, etc
Certification:ISO9001/CE/SGS
Main material for machinesSUS304 or SUS316
Place of Origin:China
Manufacturer historyMore than 10years
Voltage380V 50Hz/110V 60hz/415V 50Hz
Power consumption(Kw)energy saving type, about 100-500kw,
Operator neededAbout 6-20persons
Cooling water consumptionAbout 80-300M3
Steam consumptionAbout 300-5000T/H,
Factory space neededAbout 500-5000Sqm
Warranty12 months after commissioning
After sales serviceEngineers available to service machinery overseas

After the required infrastructure is available on site, our technical team will assemble, install and set up a complete processing line. It is best to work with local technicians. The processing line will always be commissioned after testing by our dairy operator. After the test is successful, the processing line will be debugged. Upon request, our dairy processing operators can stay on site for a period of time to provide additional training.



Q: I want to enter the dairy processing industry. What should I do?
Please fill in the quotation application form.
Q: can you help us formulate the requirements for equipment and buildings?
Please fill in the quotation application form.
Q: how big is the factory / building?
A: it depends on your requirements and the details you provide in the quotation application form.
Q: can the equipment be installed in the existing building?
A: Yes. We designed the equipment to meet the requirements.
Q: what infrastructure is needed?
You need water, electricity and sewage treatment systems. Your answers in the RFQ will help us provide you with relevant details.
Q: how many employees are needed?
Please fill in the quotation application form. It depends on capacity and product.
Q: what level of education should employees have?
A: employees should have knowledge of dairy processing.
Q: what kind of training do you need?
A: technical training requires training in hygiene and processing technology.
Q: can scherjon help us with the training?
A: Yes. We provide training during installation and in the Netherlands on request.
Q: do you have a cheese manufacturer to start a factory?
A: Yes. We have international cheese manufacturers.
Q: do you sell independent machines?
A: Yes. Please visit our website and ask for a quotation.


China SUS316 Fresh Milk Processing Equipment Dairy Beverage Processing Line supplier

SUS316 Fresh Milk Processing Equipment Dairy Beverage Processing Line

Inquiry Cart 0