

Add to Cart
Brief introduction of motorised rail transport trolley:
Working Duty | A5/M5, A6/M6, A7/M7 |
Design and Construction Rules | All the standards which is required for the crane is the Chinese standard. |
Working Principles | Motor through the shaft coupling put power into the speed reducer, speed reducer through the gears to slow down, and then slow down speed driven the drum run. Next to the gear with brake through brake control the lifting mechanism running. Overhead limit is installed on the side of the drum, once it overload,it issues an alert to terminate the run. |
Overload protection: | If the material is over the capacity, the crane will give a harp warning for protection itself. |
Emergency brake: | If the operation staff encounter some emergency situation, we could start the emergency brake system to protection the related treasure. |
Control Method: | Room control or remote control to avoid any injure to the operation staff |
Main lifting motor: | With thermal protection and currency protection. |
Some features of motorised rail transport trolley:
1. Reasonable structure and configuration
2. Favorable performance
3. Low noise
4. Commodious cabin with good view
5. Convenient maintenance
6. Excellent exchangeability for parts
7. Electricity saves
8. High safety and Precision
9. Starting and stopping smoothly
Factory view of motorised rail transport trolley:
Service of motorised rail transport trolley:
1. Payment terms is flexible.
2. Design the crane according to your technical request.
3. Delivery on time
4. Our engineer can arriving to the installation site to help fixing the crane for you.
5. Diversity products.
6. Warranty: 12 months.