GPRS Power Quality Monitoring Equipment For Energy Management System

Brand Name:Radarking
Certification:IS09001; IS014001
Model Number:RDK-PQMS-3
Minimum Order Quantity:5 pcs
Delivery Time:20-40 working days
Payment Terms:Western Union, T/T, L/C
Contact Now

Add to Cart

Verified Supplier
Location: Wuhan Hubei China
Address: No.270, Huangjinkou 3rd Village, Hanyang District, Wuhan City, Hubei Province, China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

GPRS Power Quality Monitoring Equipment of Office Buildings for Energy Management System


a.) Number of input channels
Max. 24 channels/device (configurable as voltage or current input)

b.) Measured values:
- instantaneous value of voltage
- instantaneous value of current

c.) Calculated values
- RMS voltage
- RMS current
- Apparent power
- Active power
- Reactive power (incl. capacitive/inductive indication)
- Power factor

d.) Averaging period for calculation: 1 min.

e.) Built-in GSM module for realizing GPRS communication using different protocols (FTP, http, SNMP) with capability of SMS sending function, special warnings as required and defined by the customer

f.) Built-in flash memory to prevent data loss (min. 16MB NOR flash) with microSD support

g.) Large number of configurable alarm possibilities (power cut, overcurrent, overvoltage, capacitive/ inductive reactive energy is over the threshold value, etc.) according to the customer’s needs

h.) Upload periods of calculated values to remote server: 10 min. … 24 hrs. (configurable)

i.) All parameters and the firmware can be updated remotely via the main wireless communication interface (GPRS/WiFi)

j.) Protection
- Voltage measurement overload (1 min.): 1.5 × Vn
- Voltage isolation: 2kV RMS (1 min., 50Hz)
- Pulse overload capability: 1kV (8/20us)
- Thermal protection
- Housing: IP65


Optional functional:
Saving time domain functions of current and voltage (all measured instantaneous values are stored) in case of power cut or other alarm events (min. 0.2s /10 period/, max. 5 sec, according to the sampling frequency and the number of input channels)

China GPRS Power Quality Monitoring Equipment For Energy Management System supplier

GPRS Power Quality Monitoring Equipment For Energy Management System

Inquiry Cart 0