Original Quality Standard Final Drive 227-6189 For 330D Excavator With Long Life Time

Brand Name:OEM
Model Number:227-6189
Minimum Order Quantity:1 PCS
Delivery Time:3-7 working days
Payment Terms:Western Union, MoneyGram, MoneyGram, T/T, D/P, D/A, L/C
Place of Origin:China
Contact Now

Add to Cart

Verified Supplier
Location: Guangzhou Guangdong China
Address: Huangpu, Guangzhou, China
Supplier`s last login times: within 29 hours
Product Details Company Profile
Product Details

  • Original Quality Standard Final Drive 227-6189 For 330D Excavator With Long Life Time

  • Product Specifications

Parts NameExcavator Final Drive 330D
Application
CategoryFinal Drive
Item ConditionUnused, undamaged, brand new
MOQ1

  • Description

The Final Drive reducer gearbox is the last component in the Power Train with undercarriage drive system, producing the final speed reduction and torque increase.


Attributes: Heavy Duty Final Drives are designed to be rebuilt and reused.The belowing following gear components are included in the final drive: sun gear, planetary gear, carrier, ring gear, hub, motor housing, needle bearing, roller bearing, seal.


  • How is order processed

1. Customers offer the part number, part name, model, quantity, data of items, delivery address and term


2. We quote the best price according to the requirement of customers.


3. Confirm the purchase order and pay the deposit.


4.We prepare and pack the goods.


5.Customers make the payment according to the Proforma Invoice once the goods get ready for delivery.


6. We deliver the goods with the packing list, commercial invoice, B/L and other documents requested.


7.Track the transport and arrival about the goods.


8.Welcome to give us suggestion and feedback once arrival.


  • Packaging and Delivery

Packaging details: Standard export carton, Wooden box, Polly-wood Pallet, Packaging film


Delivery: 2-5 days for parts in stock, 5-20 days for parts not in stock.


  • Payment and Delivery

Payment term: T/T, Western Union, Escrow, Money Gram, Papal


Delivery date: 2-5 days for parts in stock, 5-20 days for parts not in stock


  • Note

A. In order to give you fast and accurate pricing information, we need some details about your engine/Application and the part number of the part you want.


B. If you cannot find the parts you need, please contact us with details.



  • Other gearbox we are manufacturing


China Original Quality Standard Final Drive 227-6189 For  330D Excavator With Long Life Time supplier

Original Quality Standard Final Drive 227-6189 For 330D Excavator With Long Life Time

Inquiry Cart 0