Long Span Pre Engineered Building Structure Waiting Station Steel Roof Trusses

Brand Name:ibeehive
Minimum Order Quantity:100 tons
Delivery Time:Shipped in 30 days after payment
Place of Origin:shenyang
Price:US $500 - 700
Supply Ability:2000 tons per month
Contact Now

Add to Cart

Verified Supplier
Location: Shenyang Liaoning China
Address: Room 202, D07 building SISP, Hunnan District, Shenyang
Supplier`s last login times: within 48 hours
Product Details Company Profile
Product Details

Long Span Pre Engineered Building Structure Waiting Station Steel Roof Trusses

Specifications:

waitiing station steel structure


1. Strong Stability


2. Flexible design


3. Shorten construction


4. Low cost

waiting station steel structure


Brand name

waiting steel structure design

Model

1. Single slope, Double slope, Multi-slope.

2. Single span, Double-span, Multi-span, Single floor, Double floors.

Column and beam1. Material Q345(S355JR)or Q235(S235JR) steel.
2. All bolts connecting.
3. Straight cross-section or Variable cross-section.
FabricationAdvanced Automatic Welding Machines
Quality controlGB/T19001-2000----ISO9001:2000
SurfaceHot-dip galvanized or painted
Roof and wall panel1. EPS ,PU ,Rockwool sandwich panel.
2. Single colorful corrugated steel sheet0.326~0.8mm thick, YX28-205-820(820mm wide).
3. Sandwich panel with EPS, ROCK WOOL, PU etc insulation thickness around 50mm~150mm, 950mm or 960mm width.
Carrying capacity1. Resisting winds and seismic impacts.
2. Bearing heavy snows.
Drawing1. Making the design and quotation according to your requirements very soon.
2. Making the quotation according to your drawings.
3. Giving you the satisfying opinion to your project.

1. Application:


Widely used in all kinds of exhibition halls, market projects, steel warehouses, curtain walls, sports venues, workshops, railway stations, roof constructions, steel stores, and factory buildings, etc.


2. Carrying capacity:


With large span which can resist the impact of strong wind and

seismic impact, and bear heavy snow;


3. Durability:


The whole structure is easy for maintenance, and can be used for more

than 50 years;


4. Cost-effective:


Fast and easy installation greatly shorten the construction time which can reduce the costs effectively;


5. Features:


Fast and flexible to assemble, secure and safe, thermal and noise insulation,

water proofing and fire prevention;




Our Service
1. We own the factory with advanced equipment and well trained workers.

2. We control the cost for every step of production to keep the reasonable price .

3. We control production quality very strictly to keep ournone compensation record.

4. We guarantee 24 hours response and 48 hours solution provide service.

5. We provide free samples before orders, we accept trail order quantity before regular cooperations.

6. We ensure you get your order delivery in full within the agreed time period

7. Due to our selling power and exporting volumn, we have excellent freight rates with shipping lines.

8. We strive to always be fair and honest in our dealings with customers.

9. We strive to work together with customers to achieve much more than we can achieve alone.

10. We focus on growing business together with all of our customers,Because we understand to take care of our own benefit we firstly need to take care of customer's benefit .
11. Through our passion and commitment we aim to be a market leader in all our key markets. To maintain our position as market leader we must continue to add value in all that we do.
China Long Span Pre Engineered Building Structure Waiting Station Steel Roof Trusses supplier

Long Span Pre Engineered Building Structure Waiting Station Steel Roof Trusses

Inquiry Cart 0