Water Wall Construction For Boiler , Water Wall Tubes In Boiler TUV Certification

Brand Name:HD Boiler
Certification:ISO9001/SGS/TUV/ASME/EN
Model Number:Membrane Water Wall
Minimum Order Quantity:1Set
Delivery Time:30 Days
Payment Terms:L/C, T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Address: Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

Energy Saving Solar Water Wall Panel For Boiler TUV Certification


Product Description


The water wall is the main radiation heat surface, arranged inside the boiler chamber and proceeds the heat exchange directly with the high temperature flame. The convection tubes are the convection heat surface of the boiler, arranged between the boiler chamber outlet and the end heat surface and proceed the heat exchange directly with the high temperature fume. The water wall and convection tubes are the main heat surface of the boiler, the tubes diameter for both generally usedΦ 51-60mm boiler steel tubes, also as the request.


Parameter


NameMembrane water panel
MaterialCarbon steel,Alloy,Stainless steel
Tube sizeΦ38 - 76 mm, or as required
StandardISO , ASME
ModelStudded
ApplicationIstallable around the boiler combustion chamber


Advantages of Membrane Water Wall


1). To guarantee the leakproofness of furnace wall and reduce the air leak of combustion chamber.

2). To achieve the full water cooling of combustion chamber, and the boiler accessories membrane water wall is benefit to prevent coking under the condition of supplemental firing.

3). The thermal storage capacity is small, the warming of combustion chamber is fast and the cooling is also fast, which could shorten the cooling time of boiler’s start and furnace shut down.

4). It is good to adopt top supported water cooled wall and it could reduce the load of boiler framework, which is benefit to overhang.

5) Compared with the bare tubes, the membrane water wall improves the heat absorption capacity of tubes.

6) The factory direct boiler membrane water wall could improve the Preliminary combination degree of boiler parts and reduce the installation workload.


Company Indroduction


Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.

Features


1. Strength calculation report with applied materials information;
2. 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
3. 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler;
4. Hydraulic test report: ensure the standard working pressure and safet



Certifications



China Water Wall Construction For Boiler , Water Wall Tubes In Boiler TUV Certification supplier

Water Wall Construction For Boiler , Water Wall Tubes In Boiler TUV Certification

Inquiry Cart 0