

Add to Cart
ASME Standard H Fin Tube Horizontal Boiler Economizer Gas Fired Power Plant
Economizer Functions
The origin to use economizers is to heat the feed water using flue
gas waster heat so as to decrease the exhaust temperature and
increase boiler efficiency, save fuel consumption, which is how
economizer is named. If use boiler economizers, the feed water is
already heated here before coming to evaporation heating surface,
thus the heat absorted on evaporation heating surface as well as
the heating area is definitely decreased. Boiler economizers are
countercurrent placed. The working fluid average temperature is
lower than that of surnatured water, and apply mandatory flow to
create conditions for application of thin wall and small diameter
tubes. The whole structure is also very tight. Thus, the heat
transfer temperature difference and heat transfer co-efficient is
higher than that of convection evaporation tube bundle who has the
same smoke temperature range. That boiler economizers to replace
convection evaporation tube bundles can decrease metal consumption
by a large extend. Further more, the heated feed water comes to
steam drum, this way can decrease the temperature difference
between the water and the steam drum wall, and ultimately decrease
the thermal stress of the steam drum. Due to reasons above, now
economizer are the crutial parts of boilers. So we can summerize
the functions of economizers as below:
1. fuel saving: the economizers are placed at the rear part of
boilers. This way can decrease the smoke and gas temperatures, thus
to save fuels.
2.improve the working conditions of steam drums: due to
economizers, the feed water temperature is increased when entering
the steam drum. It reduces the temperature difference between the
feed water and steam drum wall as well as steam drum thermal
stress, so that it improve the working conditions of steam drums
and increase the service life.
3.reduce the boiler manufacturing cost: for the feed water is
heated in the boiler economizers. The use of low temperature spare
parts as boiler economizers to replace some of high-priced high
temperature water wall panels reduces the cost to manufacture
boilers.
There are three stages from the feed water in the boiler heated into superheated steam:feed water preheating, evaporation, and superheating. The three stages are finished on three different heating surfaces. The boiler steam and water circuit are composed of the three different heating surfaces as well as their connecting pipes. Boiler economizers are one of them, and it is right the equipment to preheat the feed water. Thus, it is the heating surface with the lowest temperature for boiler working fluid in the boiler steam and water circuit. The working fluid passing through this equipment is monophasic water(non-boiling economizer).
Specifications
Description | Boiler economizer |
Material | Alloy steel, Carbon steel, SA210C ,SA213T22, etc. |
Material standard | ASTM, EN or ISO etc. |
Dimension | Customization |
Weight | Min: 10 ton Max.:1000 ton |
Smelting Process: | EF+LF + VD |
Process | Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →rough machining→UT →2nd Heat treatment →finishing machining →Inspection |
UT standard | ASTM A388 or EN10228, etc |
Quality Control
1. Impact test and Strength calculation report with applied materials information.
2. 100%NDT(non-destructive inspection) report of steel plate, tube and electrode
3. X-ray, γ-ray and liquid penetrant test inspection report (welding seam): to ensure the quality of the entire boiler
4. Hydraulic test report: ensure the standard working pressure and safety